What is included The supplied PDF contains six exam sittings: June 2019; February 2021; July-August 2021; 2023; 2024; and 2025.
Missing years No 2020 or 2022 paper is present in the supplied PDF. The file name indicates 2019-2025, but the actual included sittings are non-contiguous.
How recurrence is counted One occurrence per exam sitting when a closely equivalent question appears. If a topic appears more than once within the same sitting, that sitting counts once for that row.
Wording normalization Similar conceptual prompts are merged, but different numerical data/formulations are grouped only when they test substantially the same method or idea. These are not claimed to be verbatim duplicates.
Section assignment River-engineering questions printed under Section B have been reassigned to Section A (e.g., scour, dredging, river training, river morphology, and navigability). Flood-management questions remain in Section B.
References References use the section/question labels as printed in each source paper. 'Printed B' is called out where a question is reassigned to Section A.
Sheets Use 'Section A - River Eng' and 'Section B - Flood Mgmt'. Each is sorted by Times appeared, from highest to lowest.

Section A - River Engineering

Questions are grouped by river-engineering topic regardless of the printed section. Counts are by exam sitting; closely equivalent phrasings are merged.

Normalized question / prompt family Times appeared Exact paper sittings (year/session) Question references in source PDF Grouping note
Bridge-pier/local scour: influencing factors, complex piers/effective diameter, and scour estimation 6 2019; 2021-Feb; 2021-Jul-Aug; 2023; 2024; 2025 2019: A Q4(a-c,e-f); 2021-Feb: A Q3(a); 2021-Jul-Aug: A Q3(c), printed B Q6(a-b); 2023: A Q4(b-c,e), printed B Q8(b); 2024: A Q1(e), Q4(c); 2025: A Q1(f), Q4(a-b,d) River-engineering questions printed in Section B are reassigned to Section A.
Channel geometry/hydraulic geometry: width-discharge relation, width-depth ratio, bankfull discharge and related channel dimensions 6 2019; 2021-Feb; 2021-Jul-Aug; 2023; 2024; 2025 2019: A Q1(c), Q2(a); 2021-Feb: A Q1(d); 2021-Jul-Aug: A Q1(a,c); 2023: A Q1(b); 2024: A Q1(b), Q2(d); 2025: A Q2(a) This is a broad family of channel-dimension questions; the exact variable/data differ by paper.
Dredging: processes, types, impacts, capital dredging and sustainability 6 2019; 2021-Feb; 2021-Jul-Aug; 2023; 2024; 2025 2019: printed B Q7(a); 2021-Feb: printed B Q7(c); 2021-Jul-Aug: A Q4(c-d), printed B Q7(d); 2023: printed B Q8(f); 2024: printed B Q5(c), Q7(a), Q8(b); 2025: A Q4(c), printed B Q8(b) Dredging questions are classified under River Engineering even where printed in Section B.
River slope: downstream longitudinal variation, slope-discharge relationship, or slope effect on the channel 6 2019; 2021-Feb; 2021-Jul-Aug; 2023; 2024; 2025 2019: A Q2(d); 2021-Feb: A Q1(a); 2021-Jul-Aug: A Q1(b); 2023: A Q1(c); 2024: A Q1(a); 2025: A Q1(b) Merged at the topic level because the prompt varies between longitudinal slope, slope-discharge, and the effect of slope on pattern.
River-training and bank-protection measures: groynes/spurs, riprap, gabion, revetments and active/passive structures 6 2019; 2021-Feb; 2021-Jul-Aug; 2023; 2024; 2025 2019: A Q4(d), printed B Q6(c); 2021-Feb: A Q3(c); 2021-Jul-Aug: A Q4(a), printed B Q6(d), Q8(c); 2023: printed B Q8(a,c-d); 2024: A Q1(f); 2025: A Q4(c), printed B Q8(a,c) Closely related river-training/bank-protection prompts merged.
River/channel pattern and the factors controlling it (e.g., slope, sediment size/load, width-depth ratio, sinuosity, multichanneling, bank/bed material) 6 2019; 2021-Feb; 2021-Jul-Aug; 2023; 2024; 2025 2019: A Q1(a), Q2(a); 2021-Feb: A Q1(a); 2021-Jul-Aug: A Q1(a); 2023: A Q1(a); 2024: A Q1(c); 2025: A Q1(a-b), Q2(c) Closely related formulations merged; the number counts papers/sittings, not repeated subparts within one sitting.
Sediment erosion threshold / critical shear stress / Shields parameter, including whether a bed is erodible and the relation to sediment diameter 6 2019; 2021-Feb; 2021-Jul-Aug; 2023; 2024; 2025 2019: A Q3(b); 2021-Feb: A Q3(b); 2021-Jul-Aug: A Q2(d); 2023: A Q2(e); 2024: A Q2(b), Q3(d); 2025: A Q2(e) Includes conceptual and numerical variants testing the same threshold/erodibility methods.
Sediment fall/settling velocity vs shear velocity, including erosion/deposition and suspension behaviour 6 2019; 2021-Feb; 2021-Jul-Aug; 2023; 2024; 2025 2019: A Q3(c); 2021-Feb: A Q2(b-c); 2021-Jul-Aug: A Q3(d); 2023: A Q3(d); 2024: A Q3(e), Q4(a); 2025: printed B Q8(c) Related velocity questions are grouped, while sphericity-specific wording is listed separately below.
Sediment-load classification and differences among wash load, suspended load, suspended bed-material load, bed load and bed-material load 6 2019; 2021-Feb; 2021-Jul-Aug; 2023; 2024; 2025 2019: A Q2(b); 2021-Feb: A Q1(c); 2021-Jul-Aug: A Q2(b-c); 2023: A Q2(b-d); 2024: A Q3(a-b); 2025: A Q1(d) Reworded classification and comparison questions are grouped.
Suspended-sediment concentration/distribution with depth; Rouse number and fall velocity in sediment suspension 6 2019; 2021-Feb; 2021-Jul-Aug; 2023; 2024; 2025 2019: A Q3(c); 2021-Feb: A Q2(b); 2021-Jul-Aug: A Q3(d); 2023: A Q3(c-e); 2024: A Q1(d), Q4(a-b); 2025: A Q2(d), Q3(c) Includes concentration-profile explanation and calculation variants.
Flow regimes and bed resistance/roughness: upper vs lower regime, grain vs form roughness 5 2019; 2021-Jul-Aug; 2023; 2024; 2025 2019: A Q1(b); 2021-Jul-Aug: A Q3(a); 2023: A Q3(a-b); 2024: A Q3(c); 2025: A Q1(e) No equivalent standalone upper/lower-regime prompt was identified in February 2021.
Expected river-morphology changes after dam construction/clear-water release, diversion, or changes in discharge and sediment supply 4 2021-Feb; 2021-Jul-Aug; 2024; 2025 2021-Feb: A Q3(d); 2021-Jul-Aug: A Q3(b), printed B Q6(e); 2024: printed B Q8(d); 2025: A Q3(b) Scenario-specific questions grouped because each asks for morphological response to altered flow and/or sediment conditions.
Numerical estimation of bed-load transport, including Meyer-Peter–Müller and dune-bedform approaches 4 2019; 2021-Feb; 2024; 2025 2019: A Q3(e); 2021-Feb: A Q2(d); 2024: A Q4(e); 2025: printed B Q8(e) The data and formula differ, but each requires a bed-load estimate.
Relative stability of river patterns / planform-stability ratios / why meandering may be more stable than braided rivers 4 2021-Jul-Aug; 2023; 2024; 2025 2021-Jul-Aug: A Q2(b); 2023: A Q2(a); 2024: A Q2(a); 2025: A Q2(c) Count is by sitting; 2019 included channel-pattern questions but not a directly comparable stability prompt.
Clear-water scour vs live-bed scour: differences and which may be greater 3 2019; 2021-Jul-Aug; 2025 2019: A Q4(e); 2021-Jul-Aug: printed B Q6(a); 2025: printed B Q8(c) River-engineering questions printed in Section B are reassigned to Section A.
Contraction scour: definition, conditions and why it may be insignificant at a bridge site 3 2021-Feb; 2021-Jul-Aug; 2023 2021-Feb: A Q1(b); 2021-Jul-Aug: A Q3(c); 2023: A Q4(c) Similar wording across three sittings.
Navigation and navigability: factors affecting navigation, methods to improve navigability, and advantages of river transport 3 2021-Jul-Aug; 2023; 2024 2021-Jul-Aug: A Q4(b-c); 2023: A Q4(d); 2024: A Q4(d), printed B Q8(a) No direct navigability question was found in the 2025 paper.
Stream power/shear stress relationships with velocity; bedform changes with increasing stream power 3 2019; 2021-Jul-Aug; 2024 2019: A Q2(c); 2021-Jul-Aug: printed B Q6(c); 2024: A Q3(c) Question forms differ: proportionality proof in 2019/2021 and bedform response in 2024.
Theories/hypotheses explaining the formation of meanders 3 2019; 2021-Jul-Aug; 2025 2019: A Q3(a); 2021-Jul-Aug: A Q2(a); 2025: A Q1(c) Very similar conceptual question across the listed sittings.
Active vs passive river-training structures, with examples 2 2021-Jul-Aug; 2023 2021-Jul-Aug: printed B Q6(d); 2023: printed B Q8(a) Both prompts explicitly compare active and passive training structures.
Bed load is capacity-dependent while suspended load is supply-dependent 2 2021-Feb; 2021-Jul-Aug 2021-Feb: A Q1(c); 2021-Jul-Aug: A Q2(c) This specific distinction is listed separately from the broader sediment-load classification row.
Why pier scour is generally greater than abutment scour 2 2019; 2025 2019: A Q4(a); 2025: A Q4(a) The wording is closely matched.
Effect of sediment sphericity on fall velocity 1 2024 2024: A Q3(e) Specific one-off variant of the broader sediment-velocity family.
Hydraulic geometry equations defining a river 1 2023 2023: A Q1(b) Single-sitting question.
Limitations of Lane's relationship for river equilibrium 1 2025 2025: printed B Q8(d) Reassigned to Section A as a river-engineering topic.
Meander wavelength/length and width relationship from pool-to-pool distance data 1 2024 2024: A Q2(d) Single-sitting data-analysis question.
Morphological changes downstream of a tributary confluence and a distributary off-take 1 2023 2023: A Q4(a) Single-sitting question; distinct from dam/diversion-response questions.
Morphological consequences of a river cut-off 1 2023 2023: printed B Q8(e) Reassigned to Section A as a river-engineering topic.
Pool and riffle forms and their cross-sections 1 2024 2024: A Q2(c) Single-sitting question.
River system of Bangladesh and morphological evolution of the Brahmaputra-Jamuna 1 2024 2024: printed B Q8(c) Reassigned to Section A as a river-engineering topic.
Scour vs degradation; sacrificial pile, Bandal, helical current and related short definitions 1 2025 2025: printed B Q8(c); A Q4(c) Specific terminology cluster appearing once.

Section B - Flood Management

Questions are grouped by flood-management topic. Counts are by exam sitting; closely equivalent phrasings are merged.

Normalized question / prompt family Times appeared Exact paper sittings (year/session) Question references in source PDF Grouping note
Flood risk/damage analysis or economic appraisal of mitigation/embankment projects, including annual risk reduction and benefit 6 2019; 2021-Feb; 2021-Jul-Aug; 2023; 2024; 2025 2019: B Q7(c), Q8(b-c); 2021-Feb: B Q5(c); 2021-Jul-Aug: B Q5(c), Q7(c); 2023: B Q5(b), Q7(a); 2024: B Q7(c); 2025: B Q5(b) Includes return-period risk, flood-damage assessment, and economic evaluation of flood-mitigation measures.
Causes of flooding in Bangladesh, including geographic, hydro-meteorological, climatic and upstream factors 5 2019; 2021-Jul-Aug; 2023; 2024; 2025 2019: B Q5(b); 2021-Jul-Aug: B Q7(a); 2023: B Q5(a), Q6(a); 2024: B Q5(b); 2025: B Q6(a) 2019 asks specifically about the 1998 flood and contributing factors.
Flood zoning/flood maps: purpose, required data, approaches, advantages and zones by probability 5 2019; 2021-Feb; 2021-Jul-Aug; 2023; 2024 2019: B Q7(b); 2021-Feb: B Q6(c); 2021-Jul-Aug: B Q7(b); 2023: B Q7(b); 2024: B Q6(d) No direct flood-zoning question was identified in the 2025 paper.
Flood-proofing strategy: considerations, advantages/disadvantages, or FEMA/coastal approaches 5 2021-Feb; 2021-Jul-Aug; 2023; 2024; 2025 2021-Feb: B Q6(b), Q7(a); 2021-Jul-Aug: B Q5(b); 2023: B Q6(b); 2024: B Q5(a), Q7(d); 2025: B Q6(c), Q7(c) Multiple variants are grouped because they address the same flood-proofing strategy.
Structural/non-structural flood-control measures and short-/long-term flood-management measures 5 2019; 2021-Feb; 2023; 2024; 2025 2019: B Q5(a); 2021-Feb: B Q5(a); 2023: B Q6(a); 2024: B Q6(c); 2025: B Q7(b) Different wording, but all ask for categories or time horizons of flood-management measures.
Flood forecasting/warning and its role in flood management, including Bangladesh practice 4 2019; 2023; 2024; 2025 2019: B Q8(a); 2023: B Q5(c); 2024: B Q7(b); 2025: B Q6(b) 2021 papers did not contain a closely matching forecasting question.
Flood frequency/return-period estimation from peak discharge, annual maximum rainfall, or river-stage data 4 2019; 2021-Feb; 2021-Jul-Aug; 2023 2019: B Q7(c); 2021-Feb: B Q5(c); 2021-Jul-Aug: B Q5(c); 2023: B Q7(a) Numerical datasets and requested return periods differ.
Flood damage factors, hazard/risk/vulnerability, and tangible vs intangible losses 3 2019; 2021-Jul-Aug; 2025 2019: B Q5(c), Q8(b-c); 2021-Jul-Aug: B Q7(c); 2025: B Q7(b) Questions vary between listing damage factors and assessing types of flood loss.
Flood diversion/channel for flood control and its advantages/disadvantages 3 2021-Jul-Aug; 2023; 2024 2021-Jul-Aug: B Q5(a); 2023: B Q6(c); 2024: B Q5(d) 2025 asks for a diversion dam only within a short-note set, not a directly comparable diversion-channel question.
Urban flooding: definition, impacts, or comparison with rural flooding 3 2021-Feb; 2024; 2025 2021-Feb: B Q7(b); 2024: B Q6(b); 2025: B Q7(a) 2024 asks for urban-rural differences; the other prompts focus on urban flooding and impacts.
Watershed management and why it is important for flood management 3 2021-Feb; 2023; 2024 2021-Feb: B Q7(b); 2023: B Q7(c); 2024: B Q7(a) Similar terminology across the three sittings.
Land-use/land management and its effect on flood hazards or flood-management effectiveness 2 2021-Feb; 2025 2021-Feb: B Q5(b); 2025: B Q5(d) Closely related land-management prompts.
Short notes on flood wall and levee; gravity dam; diversion dam 2 2024; 2025 2024: B Q6(a); 2025: B Q5(a) The three requested short-note topics repeat essentially verbatim.
Estimating 100-year rainfall assuming normally distributed annual maximum rainfall 1 2023 2023: B Q7(a) Single-sitting numerical question; separated from flood-discharge frequency questions.
Flood control vs flood management: definitions and distinction 1 2021-Feb 2021-Feb: B Q5(a) Single-sitting question.
Flood-proofing for coastal areas of Bangladesh 1 2021-Jul-Aug 2021-Jul-Aug: B Q5(b) Coastal-specific variant of the broader flood-proofing family.
Floodplain zones classified by probability of flood occurrence in a year 1 2024 2024: B Q6(d) Included with flood zoning above only when focusing on mapping/data; this row isolates the probability-based classification prompt.
Planning for flood management 1 2025 2025: B Q5(c) Single-sitting question.
Positive outcomes/benefits of flash floods 1 2021-Jul-Aug 2021-Jul-Aug: B Q8(b) Single-sitting question.
Probable Maximum Flood (PMF) vs Standard Project Flood (SPF) 1 2021-Jul-Aug 2021-Jul-Aug: B Q5(a) Single-sitting question.
Types of floods in Bangladesh and measures for flood control 1 2023 2023: B Q6(a) Single-sitting formulation.