Contraction Reach
- Reduced flow area, increased stuffs
- Ineffective flow area: area not wet during summer but wet during moonson seasons
- For bridge, river stations only at points of new river section (excludes constricted portion)
- Afflux
- There'll be an assignment regarding this
Procedure
Geometry
- Enter four cross sections
- Bridge/Culvert > Add Bridge > Deck:
- Bridge/Culvert > Pier:
- Copy piers 20m apart upto 4 count
-
Bridge/Culvert > Sloping Abutment:
![[Pasted image 20260827133018.png]]
![[Pasted image 20260827134119.png]]