# GEEM 445 (EWC 401): Engineering Ethics & Professional Practices — Question & Answer Bank
Course Title: Engineering Ethics and Professional Practices Course Code: GEEM 445 (formerly EWC 401) Source Materials:
/GEEM 445/SA/Lecture Slides (Lec 1–Lec 24) & ClassNotebook.pdfOrganization: Questions are grouped by individual lecture materials. Cross-cutting questions that draw upon or appear in multiple lectures are included under each relevant lecture section (with cross-references) so each lecture module serves as a self-contained study guide.
Notice, Agenda & Minutes)Source File:
SA/Lec 1 GEEM 445.pdf(28 pages)
2025 (Sec A, Q1a) · 2023 (Sec A, Q1a) · 2021 (Sec A, Q1a)SA/Lec 1 GEEM 445.pdf (p. 2–6)EA EP O)According to the lecture materials, professionalism in the workplace is maintained through five core practices (EA EP O):
E): Adhere strictly to professional and organizational codes of ethics; maintain honesty, transparency, and fairness in all decisions and reporting.A): Dress appropriately and neatly in accordance with organizational standards, safety requirements, and workplace norms.E): Show courtesy, active listening, respect for colleagues and subordinates, and proper manners in verbal, written, and digital interactions.P): Arrive on time for work and meetings, respect others' schedules, and meet project deadlines consistently.O): Keep workspaces, documentation, schedules, and tasks systematically arranged to ensure efficiency, accountability, and timely delivery.2025 (Sec A, Q3b) · 2024 (Sec A, Q3a) · 2023 (Sec A, Q3a) · 2021 (Sec A, Q4b)SA/Lec 1 GEEM 445.pdf (p. 7–9); SA/Lec 7, 8 GEEM 445-Engg Ethics.pdf (p. 7–9) (Also duplicated in SA Lectures 7 & 8)| Dimension | Morals | Ethics | Laws |
|---|---|---|---|
| Definition | Personal beliefs and convictions regarding right and wrong conduct developed within an individual's conscience. | Systematic, shared rules and standards of conduct provided by an external group, profession, or society (e.g., IEB/ASCE Code of Ethics). | Formal, codified rules of conduct enacted and enforced by a sovereign authority or government. |
| Source / Origin | Internal — shaped by family upbringing, religion, culture, and personal reflection. | External / Professional — established by professional bodies, organizations, or philosophical frameworks. | Institutional / State — enacted by legislature, courts, and regulatory acts (e.g., PPA 2006, BNBC). |
| Uniformity | Varies from person to person and across personal belief systems. | Uniform within a specific profession or institution, though may vary between professions. | Uniform and binding upon all citizens/entities within a territorial jurisdiction. |
| Enforcement & Consequence | Enforced by internal conscience; violation leads to guilt, remorse, or social disapproval. | Enforced by professional committees/boards (e.g., Ethical Review Board); violation leads to censure, suspension, or revocation of license. | Enforced by police, courts, and state agencies; violation leads to fines, civil liability, or imprisonment. |
| Engineering Example | An engineer personally feeling guilty about wasting paper or refusing to work on a project that conflicts with personal conscience. | An engineer refusing a contractor's expensive gift because the professional Code of Ethics prohibits conflict of interest. | An engineer complying with the Public Procurement Act (PPA 2006) or Bangladesh National Building Code (BNBC) under penalty of prosecution. |
2024 (Sec A, Q2a) · 2023 (Sec A, Q2a) · 2022 (Sec A, Q1a) · 2019 (Sec B, Q7a)SA/Lec 1 GEEM 445.pdf (p. 10–14); SA/Lec 3 GEEM 445, Professional Comm.pdf (p. 2–5) (Also duplicated in SA Lecture 3)Communication is a two-way dynamic process of exchanging information, ideas, thoughts, facts, and feelings between a sender and a receiver through a shared system of symbols, words, or behaviors to achieve mutual understanding.
BRAC-I & MALEE)BRAC-I):
B): Transparent and honest communication fosters trust among clients, engineers, and stakeholders.R): Maintains harmonious working relationships across multidisciplinary teams.A): Aligns team members with project objectives, specifications, and schedules, preventing costly rework.C): Helps resolve workplace misunderstandings and promotes teamwork.I): Encourages open sharing of ideas and creative problem-solving.MALEE):
M): Inspires employees and clarifies how their work contributes to project success.A): Cultivates a positive, cooperative organizational culture.L): Enables engineers and project managers to guide, influence, and direct teams effectively.E): Reduces delays, errors, and resource wastage through accurate instruction transfer.E): Translates plans, designs, and specifications into successful physical implementation.2025 (Sec B, Q5a) · 2024 (Sec B, Q5a) · 2023 (Sec A, Q4a) · 2021 (Sec A, Q2a; Sec B, Q5a)SA/Lec 1 GEEM 445.pdf (p. 15–22); SA/Lec 13 GEEM 445 PPR Proj Charac.pdf (p. 2–13) (Also duplicated in SA Lecture 13)A project is a temporary, unique, and goal-oriented endeavor undertaken to create a specific product, service, or result within defined constraints of time (schedule), cost (budget), quality (performance), and safety.
IPA PIME)In Lecture 1 (p. 18–22), the complete project cycle is structured into seven sequential stages (IPA PIME):
I): Recognizing a development need, problem, or opportunity and generating initial project concepts that align with national or organizational priorities.P): Conducting pre-feasibility and feasibility studies—covering technical, economic, financial, social, and environmental dimensions—and developing preliminary designs and cost estimates.A): Independent, critical examination of the prepared project proposal to verify its technical soundness, economic viability, financial sustainability, and institutional readiness before committing funds.P): Submitting the appraised project document (e.g., DPP or formal proposal) to the competent decision-making authority or client for formal sanction and financing approval.I): Executing the project on the ground—procurement of goods/works/services, detailed engineering construction, installation, and contract administration to create the physical deliverables.M): Continuous, systematic tracking of physical and financial progress during implementation against the baseline schedule and budget to detect deviations and take corrective action.E): Systematic assessment conducted at completion (and ex-post after operation begins) to measure the project's efficiency, effectiveness, impact, and sustainability, and to extract lessons learned for future projects.2025 (Sec A, Q1b) · 2024 (Sec A, Q4a) · 2023 (Sec A, Q4b) · 2021 (Sec A, Q2a)SA/Lec 1 GEEM 445.pdf (p. 23–28); SA/Lec 4 GEEM 445 Project Proposal.pdf (p. 2–17) (See also SA Lecture 4 for the expanded 6-type classification)RFP), Invitation for Tender (IFT), or Request for Quotation (RFQ)—where the client has already defined the problem or scope of work.Notice, Agenda & Minutes)Source File:
SA/Lec 2 GEEM 445 Meeting.pdf(26 pages)
2024 (Sec A, Q1a) · 2023 (Sec A, Q1b)SA/Lec 2 GEEM 445 Meeting.pdf (p. 2–7)A meeting is a planned assembly or gathering of two or more individuals convened for a specific purpose—to exchange information, deliberate on issues, solve problems, coordinate activities, and reach collective decisions.
CCASSM)Meetings are essential in professional and engineering organizations for six primary reasons (CCASSM):
C): Synchronize tasks, schedules, and responsibilities across different departments and project teams.C): Pool multidisciplinary expertise to brainstorm ideas and develop integrated solutions.A): Build stakeholder buy-in, management backing, and team commitment for project initiatives.S): Present and persuade colleagues, clients, or executives regarding new proposals, designs, or policies.S): Analyze technical, financial, or operational bottlenecks collectively and determine corrective actions.M): Arrive at democratic, well-vetted decisions that all key participants understand and accept.2025 (Sec A, Q2a) · 2024 (Sec A, Q1b)SA/Lec 2 GEEM 445 Meeting.pdf (p. 8–14)Before convening a meeting, the organizer/chairperson must address the following planning considerations and tasks:
Lecture 2 (p. 11–14) highlights three standard room arrangements depending on group size and interaction level:
| Room Arrangement | Layout Description | Best Suited For | Advantages & Limitations |
|---|---|---|---|
| 1. Theater / Auditorium Style | Rows of chairs facing a front stage, podium, or screen (no tables or classroom rows). | Large gatherings (30+ participants), lectures, briefings, and one-way presentations. |
Pros: Maximizes seating capacity in a given floor area; focuses attention on the speaker. Cons: Minimal participant-to-participant interaction; difficult to take notes without tables. |
| 2. U-Shaped (Horseshoe) Style | Tables and chairs arranged in an open "U" facing the front presentation area or chairperson. | Medium-sized meetings (10–25 participants), technical review meetings, training sessions, and committee discussions. |
Pros: Every participant can see one another and the front screen; presenter can walk inside the "U" to engage attendees; provides table space for documents. Cons: Requires moderate floor space. |
| 3. Circle / Round-Table / Boardroom Style | Participants sit in a closed circle or around a single central oval/rectangular table. | Small to medium groups (6–15 participants), brainstorming, consensus decision-making, and peer problem-solving. |
Pros: Promotes equality (reduced hierarchy), maximum eye contact, and open, democratic discussion. Cons: Not suitable for large groups or heavy screen-based presentations. |
Notice, Agenda, and Minutes of a meeting, state their essential components, and write sample formats for an engineering project meeting.2025 (Sec A, Q2a, Q2b) · 2024 (Sec A, Q1a, Q1b, Q1c) · 2023 (Sec A, Q1b, Q1c) · 2022 (Sec A, Q3a, Q3b) · 2021 (Sec A, Q1b) · 2019 (Sec B, Q6b)SA/Lec 2 GEEM 445 Meeting.pdf (p. 15–26)Conducting a formal professional meeting involves three chronological documentation and execution steps:
Notice and Agenda: Notifying participants of the logistics and the ordered list of topics to be discussed.Minutes: Drafting the official permanent record of decisions and action items (Action By and Deadline), obtaining the Chairperson's signature, and distributing it to all attendees and concerned stakeholders.Notice, Agenda, and MinutesNOTICE OF MEETING).Copy to).AOB / Miscellaneous) with the permission of the Chair.Action By / responsible person and target completion date).OFFICE OF THE PROJECT DIRECTOR
Urban Water Supply & Drainage Improvement Project, DPHE, Dhaka
Memo No.: DPHE/UWSDIP/2025/Mtg-04 Date: 10 October 2025
NOTICE OF MEETING
A Project Progress Review Meeting for the "Urban Water Supply & Drainage Improvement Project"
will be held on 15 October 2025 at 10:00 AM in the Conference Room (Level-4), DPHE Bhaban,
Kakrail, Dhaka. Mr. A. K. Rahman, Project Director, will preside over the meeting.
All concerned engineers and consultants are requested to attend the meeting on time.
AGENDA:
1. Welcome address by the Chairperson.
2. Review and confirmation of the minutes of the 3rd Progress Review Meeting.
3. Evaluation of physical and financial progress of Package WD-02 (Pipeline Laying Works).
4. Resolution of utility shifting delays and site safety compliance.
5. Approval of revised work schedule for Q4.
6. Any Other Business (with the permission of the Chair).
7. Vote of thanks and conclusion.
(Sd/-)
Engr. M. Hasan
Executive Engineer & Member-Secretary
Copy forwarded for kind information and necessary action to:
1. Team Leader, Design & Supervision Consultants.
2. Deputy Project Director, UWSDIP.
3. Project Manager, Contractor (M/s BuildTech Ltd.).
MINUTES OF THE 4TH PROJECT PROGRESS REVIEW MEETING
Project: Urban Water Supply & Drainage Improvement Project (UWSDIP)
Date: 15 October 2025
Time: 10:00 AM – 11:45 AM
Venue: Conference Room (Level-4), DPHE Bhaban, Dhaka
Chaired By: Mr. A. K. Rahman, Project Director, UWSDIP
Attendees Present:
1. Mr. A. K. Rahman, Project Director (Chairperson)
2. Engr. S. Islam, Deputy Project Director
3. Engr. R. Karim, Team Leader, Supervision Consultant
4. Engr. T. Ahmed, Project Manager, M/s BuildTech Ltd.
5. Engr. M. Hasan, Executive Engineer (Member-Secretary)
PROCEEDINGS & DECISIONS:
Agenda Item 1: Welcome Address
- Discussion: The Chairperson welcomed all participants and emphasized completing pipeline
works before the upcoming monsoon season.
Agenda Item 2: Confirmation of Previous Minutes
- Decision: The minutes of the 3rd Progress Review Meeting held on 12 September 2025 were
read and confirmed without amendment.
Agenda Item 3: Review of Physical and Financial Progress (Package WD-02)
- Discussion: The Supervision Consultant reported that physical progress stands at 62% against
a target of 68%, while financial disbursement is at 58%.
- Decision: The Contractor shall deploy one additional excavation crew to recover the 6%
schedule slippage within four weeks.
- Action By: Project Manager, M/s BuildTech Ltd. | Deadline: 15 November 2025.
Agenda Item 4: Utility Shifting Delays & Site Safety Compliance
- Discussion: Underground telecom cables at Sector-3 slowed trenching. Additionally, partial
barricading was observed at Night Shift Site-B.
- Decision:
(a) DPD will coordinate an urgent joint site inspection with BTCL to clear the alignment.
(b) The Contractor must install reflective barricades, warning signs, and PPE immediately.
- Action By: DPD (for BTCL coordination) & Contractor PM (for safety) | Deadline: 20 October 2025.
Agenda Item 5: Approval of Revised Q4 Work Schedule
- Decision: The revised MS Project baseline schedule was conditionally approved subject to
incorporating the two-shift pipe-testing plan.
- Action By: Team Leader, Supervision Consultant | Deadline: 22 October 2025.
Agenda Item 6: Any Other Business (AOB)
- Decision: Next (5th) Progress Review Meeting is scheduled for 18 November 2025 at 10:00 AM.
There being no further business, the Chair thanked all members and adjourned the meeting at 11:45 AM.
(Sd/-) (Sd/-)
Engr. M. Hasan Mr. A. K. Rahman
Executive Engineer & Member-Secretary Project Director & Chairperson
Source Files:
SA/Lec 3 GEEM 445, Professional Comm.pdf(25 pages) &SA/Notebook.pdf(p. 8)
2025 (Sec A, Q2c) · 2024 (Sec A, Q2a) · 2023 (Sec A, Q2a) · 2022 (Sec A, Q1a) · 2021 (Sec A, Q1c)SA/Lec 3 GEEM 445, Professional Comm.pdf (p. 2–9)According to Lecture 3 (p. 6–9), professional communication falls into three broad operational categories:
PR) campaigns that build public goodwill and corporate image.7 Cs) of effective communication.2023 (Sec A, Q2b) · 2022 (Sec A, Q1b) · 2021 (Sec A, Q1c) · 2019 (Sec B, Q7b)SA/Lec 3 GEEM 445, Professional Comm.pdf (p. 10–11)To ensure that any professional message (written or oral) achieves its intended purpose, it must satisfy the Seven Cs:
TOT LEP APC), semantic barriers, and strategies to overcome them.2025 (Sec A, Q2c) · 2024 (Sec A, Q2b) · 2023 (Sec A, Q2c) · 2022 (Sec A, Q1c) · 2019 (Sec B, Q7c)SA/Lec 3 GEEM 445, Professional Comm.pdf (p. 12–19, 22–24) & SA/Notebook.pdf (p. 8)Communication barriers (or noise) are any physical, linguistic, psychological, cultural, or organizational obstacles that distort, block, or filter a message during encoding, transmission, or decoding, causing the receiver to misunderstand the sender's intended meaning.
p. 14–16)TOT LEP APC, p. 17–19)T): Using specialized engineering or discipline-specific acronyms/terminology that lay clients or non-specialists cannot understand.O): Using pompous, overly complex vocabulary instead of plain language.T): Using offensive, culturally inappropriate, or socially sensitive language that triggers defensive reactions.L): Receiver preoccupation, fatigue, information overload, or environmental noise.E): Anger, fear, anxiety, mistrust, or hostility that clouds rational interpretation.P): Physiological impairments or poor acoustics/faulty communication channels.A): Pronunciation variations across regions or languages that hinder oral comprehension.P): Jumping to conclusions or judging the message based on biases about the speaker's status, gender, or nationality.C): Differing norms regarding eye contact, directness, hierarchy, gestures, and time across cultures.Notebook.pdf, p. 8)Semantic barriers arise specifically from limitations and ambiguities in language, words, and symbols:
p. 22–24)2024 (Sec A, Q2c)SA/Lec 3 GEEM 445, Professional Comm.pdf (p. 20–21)FIHQCD)Ethical communication is fundamental to engineering credibility and public trust. According to Lecture 3 (p. 20–21), ethical professional communication is governed by six core principles (FIHQCD):
F): Presenting information impartially and objectively without favouritism, manipulation, or hidden agendas; giving fair credit to others' contributions.I): Maintaining consistency between words and actions, honouring commitments, and refusing to falsify or selectively omit critical technical data.H): Being truthful, accurate, and sincere in all reports, proposals, cost estimates, and public statements—never deceiving clients or the public.Q): Ensuring thoroughness, technical accuracy, and care in preparing engineering documents so stakeholders can rely on them safely.C): Communicating with empathy, sensitivity, and concern for the well-being and feelings of employees, affected communities, and stakeholders.D): Respecting the inherent worth, privacy, and rights of every individual regardless of rank, gender, or background, and avoiding abusive or demeaning language.Source File:
SA/Lec 4 GEEM 445 Project Proposal.pdf(30 pages)
2025 (Sec A, Q1b) · 2024 (Sec A, Q4a) · 2023 (Sec A, Q4b) · 2021 (Sec A, Q2a)SA/Lec 4 GEEM 445 Project Proposal.pdf (p. 2–11)| Feature | Project Proposal | Project Contract |
|---|---|---|
| Core Nature | A persuasive offer or bid document presenting a proposed solution, methodology, schedule, and estimated cost to win project approval. | A formal, legally binding agreement signed between the Client (Procuring Entity) and the Contractor/Consultant after proposal acceptance. |
| Stage in Project | Prepared during the pre-award / initiation / bidding stage before work is authorized. | Executed after award (Notification of Award) and prior to project commencement. |
| Legal Enforceability | Generally non-binding until accepted and incorporated into a formal contract. | Legally enforceable in a court of law; defines rights, obligations, remedies, and penalties. |
| Primary Purpose | To convince the sponsor/client of the value, feasibility, and credibility of the proposer's approach. | To govern execution, payment terms, specifications, risk allocation, and dispute resolution. |
p. 5)p. 6–11)2025 (Sec A, Q1b, Q1c) · 2024 (Sec A, Q4a, Q4b) · 2023 (Sec A, Q4b) · 2021 (Sec A, Q2b)SA/Lec 4 GEEM 445 Project Proposal.pdf (p. 12–21)p. 12–17)RFP), Invitation for Tender (IFT), or Invitation for Bid (IFB)—which specifies strict evaluation criteria, scope, and submission formats.p. 18–21)2023 (Sec A, Q4c)SA/Lec 4 GEEM 445 Project Proposal.pdf (p. 22–30)SMART Objectives): Specify the tangible outputs to be produced and define objectives that are Specific, Measurable, Achievable, Realistic/Relevant, and Time-bound.Source File:
SA/Lec 5 GEEM 445 Research Proposal & Tech Proposal.pdf(25 pages)
2021 (Sec A, Q2c)SA/Lec 5 GEEM 445 Research Proposal & Tech Proposal.pdf (p. 2–12)p. 6–12)150–300 words) of the problem, objectives, methods, and expected contribution.2025 (Sec A, Q4a) · 2024 (Sec A, Q4c) · 2021 (Sec A, Q2c)SA/Lec 5 GEEM 445 Research Proposal & Tech Proposal.pdf (p. 13–25)A technical proposal is a specialized document prepared by an engineer, consultant, or technology vendor that translates complex technical specifications, engineering designs, and methodologies into a clear, persuasive plan tailored to solve a client's specific technical problem.
p. 16–17)R&D).p. 18)RFP) requirements, it can range from a brief 2–5 page concept note for small tasks up to 50+ pages (excluding appendices, CVs, and drawings) for major infrastructure projects.p. 15, 19–20)TOR)p. 21–25)TOR.Source File:
SA/Lec 6 GEEM 445 Financial Proposal & CEE, CWRE.pdf(29 pages)
2025 (Sec A, Q4b) · 2023 (Sec A, Q3c)SA/Lec 6 GEEM 445 Financial Proposal & CEE, CWRE.pdf (p. 2–13)p. 5–11)ROI).p. 11–13)HOPE), and evaluation committee members often review dozens of proposals under tight time constraints; a one-page summary allows them to grasp the total bid price, major cost heads, and financial feasibility at a glance.QCBS or OTM), the total offered price, taxes, and discounts must be read out loud and recorded immediately from the summary sheet.2025 (Sec A, Q4c) · 2021 (Sec A, Q3a, Q3b)SA/Lec 6 GEEM 445 Financial Proposal & CEE, CWRE.pdf (p. 14–29)p. 14–18)EIA).p. 19–20)p. 21–24)CPD).p. 25–29)According to sociological and engineering ethics literature (Greenwood's five attributes presented in Lecture 6), any true profession possesses:
BAETE) and licensing/registration of engineers (IEB).IEB or ASCE Code) that binds members to prioritize public welfare and prevents abuse of monopoly power.Source File:
SA/Lec 7, 8 GEEM 445-Engg Ethics.pdf(23 pages)
2025 (Sec A, Q3a) · 2024 (Sec A, Q3a) · 2023 (Sec A, Q3a) · 2022 (Sec A, Q4a) · 2021 (Sec A, Q4a)SA/Lec 7, 8 GEEM 445-Engg Ethics.pdf (p. 2–6)p. 3–4)Which Theory Relates to Professional Engineering? Normative Ethics (specifically through its three normative frameworks in the Ethical Triangle—Virtue, Deontology, and Utilitarianism—applied to engineering practice) forms the direct theoretical foundation of Professional Engineering Ethics and engineering Codes of Ethics.
2025 (Sec A, Q3b) · 2024 (Sec A, Q3a, Q3b) · 2023 (Sec A, Q3a) · 2021 (Sec A, Q4b)SA/Lec 7, 8 GEEM 445-Engg Ethics.pdf (p. 7–9) (See also Q1.2 for the 3-way comparison table)p. 9)While laws and ethics overlap significantly, they are not identical. Actions can be classified into four quadrants based on whether they are Legal/Illegal and Ethical/Unethical:
| Quadrant | Classification | Explanation | Lecture / Engineering Examples |
|---|---|---|---|
| Quadrant I | Ethical AND Legal | Actions that comply with state laws and uphold moral and professional duties. | Designing a structure strictly according to BNBC safety codes; honouring a valid procurement contract fairly. |
| Quadrant II | Unethical BUT Legal | Actions that do not violate any explicit statute (or exploit legal loopholes) but violate moral principles, human dignity, or professional integrity. | Operating sweatshops in jurisdictions with weak labour laws; workplace verbal harassment/bullying not explicitly covered by statute; taking credit for a subordinate engineer's design idea. |
| Quadrant III | Ethical BUT Illegal | Actions that technically breach a law, non-disclosure agreement, or state regulation, but are driven by a higher moral duty to prevent severe harm or injustice. | Whistleblowing to expose a covered-up structural or environmental hazard when internal channels fail and secrecy laws/NDAs prohibit disclosure; civil disobedience against unjust laws. |
| Quadrant IV | Unethical AND Illegal | Actions that violate both statutory law and fundamental moral/professional codes. | Slave trading; bribery and kickbacks in tendering; falsifying concrete test reports; embezzling project funds. |
2021 (Sec A, Q3c)SA/Lec 7, 8 GEEM 445-Engg Ethics.pdf (p. 10–13)| Aspect | How Engineers View Themselves (p. 10–11) |
How the Public Views Engineers (p. 12–13) |
|---|---|---|
| Core Identity | Creative Problem-Solvers: Practical innovators who turn scientific principles into useful technologies and infrastructure. | Applied Physical Scientists / Technocrats: Technical specialists focused narrowly on machines, equations, and physical systems. |
| Professional Spirit | Strong esprit de corps (camaraderie), pride in technical competence, and belief in serving humanity. | Perceived as guided by Utilitarianism (cost-benefit efficiency) and Positivism (valuing only quantifiable, empirical facts). |
| Autonomy & Motive | Desire professional freedom to design optimal solutions; view engineering as an honorable calling dedicated to public service. | Often viewed as corporate employees who execute management orders rather than independent moral agents. |
| Communication & Social Perception | Believe objective data and rational calculations speak for themselves. | The engineers' strictly rational, pragmatic, and risk-probability approach can sometimes alienate the general public, who care deeply about emotional, social, aesthetic, and zero-risk safety concerns. |
2025 (Sec A, Q3c) · 2024 (Sec A, Q3b) · 2022 (Sec A, Q4b) · 2021 (Sec A, Q4c)SA/Lec 7, 8 GEEM 445-Engg Ethics.pdf (p. 14–23)p. 14–21)When resolving complex engineering dilemmas, normative ethics provides three complementary perspectives known as the Ethical Triangle:
[1. Character-Based Ethics]
(Virtue Ethics)
"What kind of person
should I be?"
/\
/ \
/ \
/ \
/________\
[2. Principle-Based Ethics] [3. Consequence-Based Ethics]
(Deontological Ethics) (Utilitarian Ethics)
"What are my moral duties "What action produces the
and inviolable rules?" greatest good for most?"
p. 16): Craig, an environmental engineer, discovers borderline toxic contamination at a development site. Even though regulations are ambiguous and his client wants to proceed quietly, Craig discloses the hazard and recommends remediation because his personal identity as an honest, trustworthy engineer of integrity will not allow him to conceal a health risk.p. 18): Evelyn goes to the office breakroom alone to get a cup of coffee where an honour-box requests a 25-cent quarter per cup. Nobody is watching, and missing 25 cents would not noticeably harm the company. However, Evelyn puts the quarter in the box because stealing or breaking a promise is intrinsically wrong on principle.p. 20): Susan brings a box of high-calorie doughnuts to share with her office team on Friday morning. While doughnuts have sugar/fat (minor health downside), they boost team morale, camaraderie, and happiness for the entire group, yielding a positive net utility.CBA) and Environmental Impact Assessments (EIA) for a flood-control embankment or highway project to ensure societal benefits far outweigh resettlement and construction costs.p. 22–23)The Moral Spectrum describes how individuals and societies view the universality of moral truths across three positions:
Source File:
SA/Lec 9 GEEM 445-Code of Ethics.pdf(26 pages)
PAMO), and what are its main functions (SCS PSI)? Differentiate among Principles, Canons, Standards, and Rules of Conduct.2025 (Sec A, Q3a) · 2023 (Sec A, Q3b) · 2022 (Sec A, Q4c)SA/Lec 9 GEEM 445-Code of Ethics.pdf (p. 2–10)A Code of Ethics is a formal, written framework of fundamental moral principles, canons, and enforceable rules of conduct adopted by a professional society (such as ASCE, IEB, or NSPE) to guide its members in ethical decision-making and to express the profession's collective commitment to public welfare.
PAMO, p. 4)P): Prioritizes public safety, health, and welfare against incompetent or unscrupulous practice.A): Provides authoritative backing when an engineer must refuse an employer's or client's pressure to cut corners on safety or quality.M): Ensures all practitioners abide by the same ethical rules (e.g., no bribery or underbidding through compromised safety), creating a level playing field.O): Assures society and regulators that the profession is self-regulating and worthy of public confidence.SCS PSI, p. 5–7)S): Acts as a solemn pledge that engineering expertise will be used for human benefit.C): Used in classrooms and workshops to cultivate ethical awareness among young engineers.S): Establishes uniform benchmarks of acceptable conduct across the entire profession.P): Gives legal and institutional reinforcement to engineers who stand up for ethical practice.S): Provides clear grounds for investigating misconduct and disciplining violators.I): Inspires engineers to strive for moral excellence and guides them through complex ethical choices.p. 8–10)2024 (Sec A, Q3c) · 2023 (Sec A, Q3b) · 2022 (Sec A, Q4c)SA/Lec 9 GEEM 445-Code of Ethics.pdf (p. 11–26)KHSS, p. 11)Engineers uphold and advance the integrity, honor, and dignity of the engineering profession by:
K) for the enhancement of human welfare and the environment;H) and serving with fidelity the public, their employers, and clients;S) of the engineering profession; andS) of their disciplines.p. 12–13)2024 Q3c, p. 16–19)Source File:
SA/Lec 10 GEEM 445 IFCE Ethics.pdf(20 pages)
ASU) and five core characteristics of Consulting Engineers under FIDIC (IFCE), and write a short note on BACE (including full forms of FIDIC, BACE, ASPAC, TCDPAP, and FBCCI).2022 (Sec B, Q7a, Q7b) · 2019 (Sec A, Q4b)SA/Lec 10 GEEM 445 IFCE Ethics.pdf (p. 2–13)p. 2, 7–9)FIDIC: Fédération Internationale des Ingénieurs-Conseils (in English: IFCE — International Federation of Consulting Engineers), founded in 1913 and headquartered in Geneva, Switzerland.BACE: Bangladesh Association of Consulting Engineers (founded in 1975).ASPAC: Association of Consulting Engineers of Asia-Pacific (regional federation of FIDIC member associations).TCDPAP: Technical Consultancy Development Programme for Asia and the Pacific (an ESCAP-sponsored regional network).FBCCI: Federation of Bangladesh Chambers of Commerce and Industry.p. 3–4)ASU, p. 5–6)A): Accept full professional responsibility for the welfare of society, sustainable development, and the technical soundness of their engineering solutions.S): Always seek solutions that are compatible with the principles of sustainable development and serves the best public and client interest.U): Uphold the dignity, standing, and reputation of the consulting engineering profession at all times.BACE (p. 7–9)BACE) was established in 1975 as the apex national trade and professional body representing independent consulting engineering firms in Bangladesh.BACE is the official national member association of FIDIC (IFCE), a member of ASPAC and TCDPAP, and an institutional member of FBCCI.QBS/QCBS under PPR 2008), enforces ethical standards among member firms, and facilitates international joint ventures and technology transfer.p. 10–13)IEB) and explain the role of the Ethical Review Board (ERB).2023 (Sec A, Q3b) · 2022 (Sec B, Q7c)SA/Lec 10 GEEM 445 IFCE Ethics.pdf (p. 14–20)IEB Code of Ethics (p. 14–19)The Institution of Engineers, Bangladesh (IEB) mandates 13 core ethical clauses for all Corporate Members, Associate Members, and registered engineers:
CPD) of engineers under their supervision.IEB and the host country's engineering society.ERB, p. 20)ERB) is the standing disciplinary and advisory body within the professional institution tasked with investigating complaints of unethical conduct, holding impartial hearings, interpreting the Code of Ethics, and recommending disciplinary sanctions (warning, reprimand, suspension, or expulsion/cancellation of professional registration) to the Central Council.Source File:
SA/Lec 11 GEEM 445 Prof Engagement.pdf(30 pages)
2025 (Sec B, Q7b) · 2021 (Sec B, Q6a)SA/Lec 11 GEEM 445 Prof Engagement.pdf (p. 2–4, 15–16)Professional engagement is the formal contractual and ethical process through which a qualified engineering professional or consulting firm is retained by a client (Procuring Entity) to deliver specialized technical, advisory, design, or supervision services within an agreed scope, schedule, and fee structure.
p. 3–4)SOW/TOR, deliverables, schedule, and remuneration) between client and consultant.p. 15–16)EOI / RFP / IFT): Issuing or responding to formal requests for expressions of interest, proposals, or bids.QBS / QCBS / FBS): Assessing technical and financial proposals and selecting the most qualified firm.RFP, IFB, IFT, RFQ, and EOI. Describe the key committees/roles in the tendering process (Procurement Team, PE, TOC, TEC, HOPE) and list the ten key components of writing an engineering proposal.2025 (Sec B, Q7a) · 2024 (Sec B, Q6b) · 2023 (Sec B, Q6a) · 2021 (Sec B, Q6a)SA/Lec 11 GEEM 445 Prof Engagement.pdf (p. 5–11, 24–27)p. 5–8)IFB (Invitation for Bid) / IFT (Invitation for Tender): A formal public notice inviting qualified contractors or suppliers to submit sealed priced tenders for clearly specified Goods or Works.RFP (Request for Proposal): A formal solicitation document issued to shortlisted consultants or specialized vendors inviting comprehensive Technical and Financial Proposals where methodology and expertise are critical (especially for Intellectual and Professional Services).RFQ (Request for Quotation): A simplified solicitation used to obtain competitive price quotations for low-value, standard, off-the-shelf goods or minor works.EOI / REOI (Request for Expression of Interest): A pre-solicitation public advertisement inviting consulting firms to submit their credentials, experience, and resources so the Procuring Entity can compile a short-list of qualified firms to receive the RFP.p. 9–11)PE): Any government ministry, division, department, statutory body, or public enterprise possessing the administrative and financial authority to undertake public procurement.HOPE): The top executive administrative authority of a Procuring Entity (e.g., Secretary of a Ministry, Chief Engineer of PWD/LGED/RHD, or Managing Director of a corporation).PE that prepares annual procurement plans, tender documents, specifications, and official cost estimates.TOC) / Proposal Opening Committee (POC): The committee appointed to open received tenders/proposals publicly right after the submission deadline, read out prices and key details, and prepare the signed Opening Sheet.TEC) / Proposal Evaluation Committee (PEC): The specialized technical committee (5–7 members, including external experts) responsible for evaluating tenders/proposals strictly against the predetermined criteria in the Tender Document/RFP and submitting the Evaluation Report to the Approving Authority.p. 24–27)WBS) & Project Schedule / TimelineSOW)" and "Scope of Work" in a project proposal or contract.2025 (Sec B, Q7b) · 2024 (Sec B, Q6a)SA/Lec 11 GEEM 445 Prof Engagement.pdf (p. 12–14)SOW) and Scope of Work| Dimension | Statement of Work (SOW) |
Scope of Work |
|---|---|---|
| Definition | A comprehensive, formal narrative contract document that defines the entire project engagement—including background, objectives, scope, deliverables, schedule, standards, payment terms, and governance. | A specific subset / section within the SOW (or proposal) that details the exact boundaries, tasks, technical activities, and deliverables to be performed. |
| Breadth / Coverage | Macro-level umbrella document covering Why, What, How, When, Where, Who, and At What Cost/Terms. | Task- and boundary-level specification focusing on What work is included (and excluded) and How it will be executed. |
| Typical Contents | 1. Purpose/Background 2. Scope of Work 3. Location of Work 4. Period of Performance / Schedule 5. Deliverables Matrix & Acceptance Criteria 6. Applicable Codes/Standards 7. Payment Schedule & Special Contract Terms. |
1. Detailed list of engineering tasks & phases 2. Technical methods & workflow 3. Specific inclusions and explicit exclusions (to prevent scope creep) 4. Resource & role allocation for tasks. |
| Relationship | The parent contractual document (SOW contains the Scope of Work). |
A core component inside the SOW or RFP. |
QBS)? Describe the five steps of the QBS process, its benefits and limitations, and compare QBS with Fixed Budget Selection (FBS).2025 (Sec B, Q7c) · 2024 (Sec B, Q6c) · 2023 (Sec B, Q7c) · 2021 (Sec B, Q6b)SA/Lec 11 GEEM 445 Prof Engagement.pdf (p. 17–23); SA/Lec 19 GEEM 445 PPR Intellec Svc.pdf (p. 10–14) (See also SA Lecture 19)QBS)Qualification-Based Selection (QBS) is a competitive procurement process used to select architectural, engineering (A/E), and consulting firms based initially solely on their technical qualifications, competence, experience, and project understanding, without considering price until the highest-ranked firm is selected for contract negotiation.
QBS Process (p. 18–20)REOI / RFQ): The client defines the project objectives, scope outline, and qualification criteria, and invites consulting firms to submit Statements of Qualifications (SOQ).SOQs against predetermined criteria (experience, technical capability, key personnel, past performance, capacity) and selects a shortlist of the top 3–5 firms.Rank 1, 2, 3...).SOW) and submit a financial proposal, followed by negotiations to agree on a fair and reasonable compensation.QBS (p. 21–22)QBS:
1%–3% of total life-cycle cost, whereas superior design saves 10%–20%+ in construction and operation/maintenance costs).QBS:
QBS) vs. Fixed Budget Selection (FBS, p. 23)| Feature | Qualification-Based Selection (QBS) |
Fixed Budget Selection (FBS) |
|---|---|---|
| Budget Disclosure | Budget is not fixed upfront; fee is negotiated with the #1 ranked firm after joint scope refinement. | The exact maximum available budget is disclosed upfront in the RFP. |
| Selection Basis | Ranked 100% on technical qualifications first; only the top-ranked firm's fee is negotiated. | Firms submit both Technical and Financial Proposals; any financial proposal exceeding the fixed budget is rejected, and the firm with the highest technical score within the budget wins. |
| Best Suited For | Complex, high-risk, multidisciplinary engineering designs where scope needs collaborative refinement. | Simple, precisely defined assignments where the TOR and available budget are strictly fixed and cannot be exceeded. |
Source File:
SA/Lec 13 GEEM 445 PPR Proj Charac.pdf(25 pages)
2025 (Sec B, Q5a) · 2024 (Sec B, Q5a) · 2023 (Sec A, Q4a) · 2021 (Sec A, Q2a; Sec B, Q5a)SA/Lec 13 GEEM 445 PPR Proj Charac.pdf (p. 2–9)p. 2)According to the Project Management Institute (PMI), a project is "a temporary endeavor undertaken to create a unique product, service, or result," executed through a sequence of interrelated activities within bounded time, cost, and quality parameters.
OL-ST LUC-MUR, p. 3–5)O): Has a clearly defined set of specific, measurable goals and deliverables.L): Progresses through distinct phases from conception to clean-up/handover.S): Managed as a single integrated organizational unit under one Project Manager/Director, even when multiple firms participate.T): Relies on coordinated effort across multidisciplinary professionals and trades.L): Has a definite start date (Zero-date) and a definite completion date.U): No two projects are ever identical in location, site geology, design, or timing.C): Undergoes continuous adaptation across its life cycle as engineering details and site conditions evolve.M): Custom-designed and executed specifically to meet the requirements of a particular client or public need.U): Integrates diverse technologies, materials, vendors, and regulatory requirements toward a unified goal.R): Subject to technical, financial, environmental, and schedule risks that decrease only as the project nears completion.p. 6–7)p. 8–9)2025 (Sec B, Q5a) · 2024 (Sec B, Q5a) · 2022 (Sec B, Q5a) · 2021 (Sec B, Q5a) · 2019 (Sec A, Q2a)SA/Lec 13 GEEM 445 PPR Proj Charac.pdf (p. 10–14)p. 10–13)According to Lecture 13, an engineering project traverses five sequential life-cycle phases, each accounting for a distinct share of total project effort/expenditure:
| Phase | Name of Phase | Typical Effort / Cost Share | Key Activities & Deliverables |
|---|---|---|---|
| Phase 1 | Conception Phase | ~4% |
Idea generation, identification of need, preliminary technical/economic screening, and pre-feasibility assessment. |
| Phase 2 | Definition Phase | ~8% |
Detailed feasibility study, appraisal, site investigation, preliminary design, baseline cost/schedule estimation, and formal project approval (Zero-date set at the end of this phase). |
| Phase 3 | Planning & Organizing Phase | (Included in Definition/Implementation transition) | Setting up the project organization, Work Breakdown Structure (WBS), detailed engineering design, preparation of Tender Documents (TD), and procurement of contractors/consultants. |
| Phase 4 | Implementation Phase | ~85% |
Physical execution/construction, equipment installation, contract administration, progress monitoring, quality control, and cost/schedule control (consumes the vast majority—~85%—of project funds). |
| Phase 5 | Clean-Up / Termination (Handover) Phase | ~3% |
Testing and commissioning, preparation of as-built drawings, final bill settlement, release of securities, site demobilization, and formal handover to the operating authority. |
Total Expenditure across Life Cycle: .
p. 14)t < 0).t = 0).2025 (Sec B, Q5b) · 2024 (Sec B, Q5b, Q5c) · 2022 (Sec B, Q5b) · 2021 (Sec B, Q5b) · 2019 (Sec A, Q2b)SA/Lec 13 GEEM 445 PPR Proj Charac.pdf (p. 15–25)p. 15–16)BCR, NPV, IRR).DPP and ADP) to arrange financing and phase annual cash flows.p. 17–20)Because complete engineering details are not available at project inception, cost estimation is refined iteratively across five progressive stages:
| Stage | Type of Cost Estimate | Project Stage / Basis | Typical Accuracy Range |
|---|---|---|---|
| 1 | Order of Magnitude (Ballpark) Estimate | Prepared during Conception based on capacity ratios or historical costs of similar past projects before any design exists. | ± 60% (or ± 50%–60%) |
| 2 | Study (Factored / Feasibility) Estimate | Prepared during Feasibility Study using preliminary process flowcharts, site location, and major equipment/structural factors. | ± 30% |
| 3 | Preliminary (Authorization / Budget) Estimate | Prepared during Project Definition / Appraisal (DPP preparation) with preliminary layouts and sizing to seek formal budget sanction. |
± 20% |
| 4 | Definitive (Project Control) Estimate | Prepared after Basic Engineering & Soil/Site Investigations are complete and major equipment/material quotes are known. | ± 10% |
| 5 | Detailed (Engineer's / Tender) Estimate | Prepared from 100% completed working drawings, detailed specifications, and Bill of Quantities (BOQ) just prior to tendering/construction. |
± 5% |
p. 21–22)Even the most rigorous Detailed Estimate (± 5%) cannot achieve 100% accuracy until construction has completely ended and full-scale operation has begun due to unavoidable uncertainties:
p. 23–25)Time Study: Systematic measurement of the time required by a qualified worker to perform a standard unit of work under normal site conditions.
Guesstimating & Three-Point PERT Estimation: When activity durations are uncertain, expected time () is estimated using a weighted average of three time estimates:
where = Optimistic time, = Most likely time, and = Pessimistic time.
Parkinson's Law (p. 25): "Work expands so as to fill the time available for its completion." If an overly generous time estimate is padded into a schedule, workers and contractors naturally slow their pace to consume the entire allotted duration rather than finishing early.
Source File:
SA/Lec 14 GEEM 445 Contract.pdf(30 pages)
2025 (Sec B, Q6a) · 2023 (Sec B, Q5a) · 2021 (Sec B, Q5c)SA/Lec 14 GEEM 445 Contract.pdf (p. 2–7)A contract is a formal, legally binding agreement voluntarily entered into between two or more competent parties (in engineering: the Employer / Procuring Entity and the Contractor / Consultant), enforceable by law, under which one party agrees to perform specified works or services in exchange for lawful monetary consideration from the other party.
p. 4–5)| Feature | Main Contract (Prime Contract) | Subcontract |
|---|---|---|
| Contracting Parties | Signed directly between the Employer (Client / PE) and the Main (Prime) Contractor. |
Signed between the Main Contractor and a specialized Subcontractor to execute a specific portion of the works (e.g., HVAC, piling, electrical). |
| Privity of Contract | Direct legal relationship (privity of contract) exists with the Employer. | No direct contractual relationship exists between the Employer and the Subcontractor (unless explicitly nominated/novated). |
| Ultimate Liability | The Main Contractor bears 100% legal and performance responsibility to the Employer for the entire project, including all subcontracted works. | The Subcontractor is accountable directly to the Main Contractor under the terms of the subcontract. |
| Approval Requirement | Awarded through the Employer's formal procurement/tendering process. | Under PPR 2008, subcontracting requires prior written approval from the Procuring Entity and cannot exceed the specified ceiling (typically 20%–30% of contract value). |
p. 6–7)BOQ and SOR)CPFF, CPPF, and Cost Plus Fluctuating Fee)DB) ContractDBO) / Public-Private Partnership (PPP / PFI) ContractBOQ and SOR) with advantages, and explain "Cost-Reimbursable Contract" and its three types.2025 (Sec B, Q6b) · 2023 (Sec B, Q5a, Q5b) · 2022 (Sec B, Q6a) · 2019 (Sec A, Q3a)SA/Lec 14 GEEM 445 Contract.pdf (p. 8–18)p. 8–12)Definition: An Admeasurement Contract (also called a Unit-Rate or Measure-and-Value Contract) is a contract in which the contractor quotes fixed unit rates for individual items of work, and the final payment is determined by measuring the actual physical quantities of work executed on site and multiplying them by the agreed unit rates:
Two Forms of Admeasurement Contract:
BOQ) Contract: Used when detailed drawings and specifications are ready prior to tendering, enabling the Procuring Entity to prepare an itemized list of estimated quantities (BOQ) against which tenderers quote their unit rates.SOR) Contract: Used for term maintenance works or urgent projects where the exact nature of work items is known, but the exact quantities cannot be determined in advance. Contractors bid a percentage above or below a standard Schedule of Rates (e.g., PWD/LGED Schedule of Rates), and payment is made based on actual measured work.Four Key Advantages of Admeasurement Contracts (p. 11–12):
BOQ items, making tender evaluation objective and transparent.MB).p. 13–18)Cost Plus Percentage Fee (CPPF):
Cost Plus Fixed Fee (CPFF):
Cost Plus Fluctuating Fee (Target-Cost / Incentive Fee Contract):
PPP) / Private Finance Initiative (PFI) contract? Describe its key features, three types with examples, and its advantages and disadvantages.2025 (Sec B, Q6c) · 2023 (Sec B, Q5c) · 2022 (Sec B, Q6b)SA/Lec 14 GEEM 445 Contract.pdf (p. 21–30)PPP / PFI Contract (p. 21–24)PPP) (or Private Finance Initiative, PFI) is a long-term contractual arrangement (typically 15–30+ years) between a public-sector authority and a private-sector consortium (Special Purpose Vehicle, SPV) under which the private party designs, finances, builds, operates, and maintains (DBFO / BOT) public infrastructure and recovers its investment either through user charges or public-sector service payments before transferring the asset back to the government.DBFO) phases under a single private consortium.PPP / PFI Projects with Lecture Examples (p. 25–27)PPP / PFI Contracts (p. 28–30)ADP).20–30 years, it builds higher durability to minimize long-term maintenance costs.10–15 years into a 30-year contract can be difficult and expensive.Source File:
SA/Lec 15 GEEM 445 PPA-PPR.pdf(31 pages)
PPA 2006 and PPR 2008, state the four applicability cases of PPR 2008, and define key procurement terms (HOPE, PM, Force Majeure, Approving Authority, Responsive, Conflict of Interest, Public Fund, Quotation, TD).2025 (Sec B, Q8a) · 2024 (Sec B, Q7a) · 2023 (Sec B, Q6a) · 2022 (Sec B, Q8a) · 2021 (Sec B, Q7a) · 2019 (Sec A, Q1a)SA/Lec 15 GEEM 445 PPA-PPR.pdf (p. 2–23)p. 2–4)PE) using Public Funds to achieve economy, efficiency, transparency, fairness, competition, and value for money.PPA 2006 and PPR 2008 (p. 5–9)| Dimension | Public Procurement Act, 2006 (PPA 2006) |
Public Procurement Rules, 2008 (PPR 2008) |
|---|---|---|
| Legal Status | Primary Legislation (Act No. 24 of 2006) enacted by the National Parliament (Jatiya Sangsad) of Bangladesh. | Secondary / Delegated Legislation framed and issued by the Government (IMED, Ministry of Planning) under the authority of Section 70 of PPA 2006. |
| Core Purpose | Establishes the overarching statutory principles, legal mandate, and policy framework ("What must be done"). | Provides the detailed operational rules, time limits, financial thresholds, committee structures, and standard procedures ("How it is to be done"). |
| Structure | Consists of 9 Chapters and 73 Sections. | Consists of 9 Chapters, 130 Rules, and 14 Schedules (Schedules I–XIV). |
| Amendment Process | Requires a formal amending Act passed by Parliament. | Can be amended by the Government through an official Statutory Regulatory Order (SRO) / Gazette Notification (providing operational flexibility). |
PPR 2008 (p. 10–11)Under Section 3 of PPA 2006 and Rule 3 of PPR 2008, the Rules apply across Bangladesh to:
SOEs): All corporations, authorities, local government institutions, and public companies funded by the public exchequer.PPA 2006 & PPR 2008 (p. 12–23)HOPE (Head of the Procuring Entity): A Secretary of a Ministry/Division, Head of a Government Department/Directorate (e.g., Chief Engineer), or Chief Executive of a statutory/autonomous body or corporation.PM (Project Manager) / PD (Project Director): The officer designated by the Procuring Entity to administer the execution of a specific contract or development project on behalf of the PE.AA): The authority empowered under the Delegation of Financial Powers (DOFP) issued by the Ministry of Finance (or corporate board) to approve the award of a contract (e.g., Project Director, HOPE, Minister, or Cabinet Committee on Government Purchase CCGP).RFQ) for low-value, readily available goods or simple works.TD): The official package of documents issued by a Procuring Entity based on CPTU's Standard Tender Documents (STD) that provides all instructions, specifications, drawings, bill of quantities, and contract conditions required for preparing and submitting a tender.TOC), Tender Evaluation Committee (TEC), and Enlistment Committee under PPR 2008.2025 (Sec B, Q8b) · 2024 (Sec B, Q7b) · 2023 (Sec B, Q6b) · 2021 (Sec B, Q7b)SA/Lec 15 GEEM 445 PPA-PPR.pdf (p. 24–31)TOC/POC, TEC/PEC, and Enlistment Committee| Attribute | Tender / Proposal Opening Committee (TOC / POC) |
Tender / Proposal Evaluation Committee (TEC / PEC) |
Enlistment Committee |
|---|---|---|---|
| Governing Rule | Rule 7 of PPR 2008 |
Rules 8, 9 & 10 of PPR 2008 |
Rule 52 of PPR 2008 |
| Number of Members | Minimum 3 (three) members | Typically 5 (five) to 7 (seven) members (minimum 3 only for low-value RFQ) | Minimum 3 (three) members |
| Composition & External Members | - 1 Chairperson from the Procuring Entity - 1 Member from the TEC/PEC- 1 Member from the accounts/finance or administrative unit of the PE. |
- Chairperson: Senior technical officer of the PE- Internal Members: Experienced technical & finance officers of the PE- External Members: Must include at least 2 (two) external members from outside the PE (other government agencies/universities) experienced in the relevant field. |
- 1 Chairperson (senior officer nominated by HOPE)- 2 Members (one technical officer and one finance/administrative officer of the PE). |
| Key Functions & Responsibilities | 1. Open all received tenders/proposals publicly immediately after the submission deadline at the designated venue. 2. Check presence of Tender Security, read out Tenderer's name, quoted price, discounts, and modifications. 3. Encircle and initial all rates/pages, record the Tender Opening Sheet ( TOS), and hand over all tenders safely to the TEC Chairperson. |
1. Conduct preliminary examination, technical responsiveness check, and financial evaluation strictly per TD criteria.2. Verify arithmetic errors, post-qualification, and unbalanced/front-loaded rates. 3. Prepare and sign a unanimous Evaluation Report with clear award recommendation and submit it directly to the Approving Authority. |
1. Convene at least once a year to review applications from suppliers/contractors for Limited Tendering Method (LTM).2. Verify Trade License, TIN, VAT registration, liquid assets, and technical capacity. 3. Maintain and update the official List of Enlisted Suppliers/Contractors. |
Source File:
SA/Lec 16 GEEM 445 PPR Pro Method.pdf(23 pages)
OTM) and Limited Tendering Method (LTM) under PPR 2008, including minimum tender submission times for OTM and the eligibility criteria/thresholds for LTM.2025 (Sec B, Q8b) · 2024 (Sec B, Q7c) · 2023 (Sec B, Q6c, Q7a) · 2022 (Sec B, Q8b) · 2021 (Sec B, Q7c) · 2019 (Sec A, Q1b)SA/Lec 16 GEEM 445 PPR Pro Method.pdf (p. 2–13)OTM — Rules 61–62, p. 2–6)OTM) is the preferred and default method of public procurement for Goods, Works, and Physical Services under PPA 2006 (Section 31) and PPR 2008 (Rule 61). Under OTM, an Invitation for Tender (IFT) is publicly advertised in newspapers and on the CPTU website (e-GP), allowing all interested qualified national (or international) tenderers to compete equally.OTM (Schedule II / Rule 61):
≤ 2 Cr): Minimum 14 Calendar Days (≥ 14 CD)2–5 Cr): Minimum 21 Calendar Days (≥ 21 CD)> 5 Cr): Minimum 28 Calendar Days (≥ 28 CD)≥ 10 CD)LTM — Rules 63–64, p. 7–13)LTM) is a restricted procurement method in which the Procuring Entity invites tenders either from a restricted number of specialized suppliers/manufacturers or from pre-verified Enlisted Contractors/Suppliers maintained under Rule 52.LTM (Rule 63):
3 Cases):
OTM is impractical (provided the urgency was not caused by dilatory conduct of the PE).1 Case using Enlisted Firms):
4. Procurement of Simple/Routine Goods and Works via Enlisted Tenderers:
≤ Tk 2,500,000).≤ Tk 20,000,000) (note: earlier baseline Rule 63(1)(c)/Schedule II specified lower initial thresholds, updated to Tk 25 Lac for Goods and Tk 2 Crore for Works; minimum submission time is ≥ 7 to 14 days).TSTM) and the One-Stage Two-Envelope Tendering Method (OSTETM) under PPR 2008, including their applicability criteria and step-by-step procedures.2025 (Sec B, Q8b) · 2024 (Sec B, Q7c) · 2023 (Sec B, Q7a) · 2021 (Sec B, Q7c)SA/Lec 16 GEEM 445 PPR Pro Method.pdf (p. 14–23)TSTM — Rules 65–68, p. 14–19)PE needs to hold technical discussions with tenderers before finalizing specifications.Rules 66–68):
PE issues the Tender Document specifying conceptual performance requirements and invites unpriced Technical Proposals (allowing at least 42 Calendar Days for submission).TEC evaluates the conceptual technical proposals and holds confidential one-on-one technical clarification discussions with responsive tenderers to refine the technical solution.PE prepares a formal "Minutes of Adjustment" (or Addendum to Specifications) for each responsive tenderer indicating the exact changes required to make their technical offer acceptable.OTM to award the contract to the lowest evaluated responsive tenderer.OSTETM — Rules 68A–68D, p. 20–23)PE, but the PE wants to evaluate Technical Qualifications and Responsiveness completely free from any price bias before opening financial bids.Rules 68B–68D):
"Technical Offer" (containing technical specifications, qualification documents, and Tender Security—with zero price information)."Financial Offer" (containing the priced Bill of Quantities / Price Schedule).TOC publicly opens only Envelope-1 (Technical Offer) on the deadline day, while Envelope-2 (Financial Offer) is kept unopened in safe custody under seal.TEC evaluates all Technical Offers for qualification and responsiveness and obtains approval of the Technical Evaluation Report from the Approving Authority (HOPE).TEC checks arithmetic errors and unit rates of the opened financial offers and recommends award to the Lowest Evaluated Substantially Responsive Tenderer.Source File:
SA/Lec 17 GEEM 445 RFQ, DP.pdf(28 pages)
RFQ) method under PPR 2008, including when it is used, its key rules (securities, minimum quotations, submission time), the four required documentary evidences, and its procedure.2024 (Sec B, Q7c) · 2023 (Sec B, Q6c) · 2022 (Sec B, Q8b) · 2021 (Sec B, Q7c)SA/Lec 17 GEEM 445 RFQ, DP.pdf (p. 2–13)RFQ — Rules 69–73) is Used (p. 2–5)The RFQ method is used for low-value, urgent, or routine procurement within prescribed financial thresholds (Schedule II):
RFQ (p. 6–8)RFQ method.PE should invite quotations from as many reputed suppliers as practical (typically 5–7) so as to receive at least 3 (three) responsive competitive quotations.3–7 working days) to submit their written quotations in sealed envelopes or via e-GP.BOQ Rate Negotiation: Price is quoted as a lump sum or simple unit schedule, and no price negotiation is permitted with the lowest bidder.RFQ Bidders (p. 9)Unlike OTM, RFQ bidders only need to submit four basic legal/financial documents with their signed quotation:
TIN) Certificate (Proof of tax compliance)BIN)RFQ (p. 10–13)RFQ Document: The PE prepares a concise RFQ document specifying item descriptions, quantities, delivery period, and place of delivery.RFQ notice is published on the PE's notice board (and website/e-GP) and sent directly to reputed/enlisted suppliers.TEC.TEC: Confirming that at least 3 responsive quotations have been received, verifying arithmetic accuracy and the 4 documentary evidences, and selecting the lowest evaluated responsive quotation.PE issues a direct Purchase Order (PO) or Work Order to the winning supplier/contractor.DPM) under PPR 2008 and describe its five forms (Direct Contracting, Repeat Order, Variation / Extra Work Order, Direct Cash Purchase, and Force Account) with their conditions and financial limits.2025 (Sec B, Q8b) · 2023 (Sec B, Q6c, Q7a) · 2022 (Sec B, Q8b) · 2019 (Sec A, Q1b)SA/Lec 17 GEEM 445 RFQ, DP.pdf (p. 14–28)DPM — Rules 74–82)The Direct Procurement Method (DPM) involves procuring Goods, Works, or Services directly from a single source without open competition. Because it restricts competition, DPM may be used only under strict statutory conditions specified in Rules 74–82 with prior approval of the HOPE (or Approving Authority).
DPM, p. 16–28)OEM) or sole authorized agent.G2G / public agency).PE invites a priced offer from the single source and negotiates technical and price terms to ensure value for money.OTM/LTM), either as partial replacement or extension of existing supplies where changing supplier would force the PE to acquire incompatible equipment.15% (fifteen percent) of the original contract price.VO) / Extra Work Order (EWO) (Rules 78–79)VO): Any increase or decrease in the quantity of an existing BOQ item, modification of quality/dimensions, or change in sequence required during construction of a Works contract.EWO): New items of work not included in the original BOQ that become indispensable due to unforeseen site conditions to complete the works safely.15% (fifteen percent) of the original contract price under the normal Approving Authority (any variation beyond 15% requires exceptional approval from the next higher authority / HOPE / Ministry).Source File:
SA/Notebook.pdf(Pages 63–65); supplemented bySA/Lec 20 GEEM 445 Tend Docus.pdf(p. 27–28)
PPR 2008. How is the Tender Security amount fixed without disclosing the official cost estimate? Under what conditions are Tender Security and Performance Security forfeited?2025 (Sec B, Q8c) · 2023 (Sec B, Q6b) · 2022 (Sec B, Q8c) · 2019 (Sec A, Q1c)SA/Notebook.pdf (p. 63–65); SA/Lec 20 GEEM 445 Tend Docus.pdf (p. 27–28)Notebook.pdf p. 63)Notebook.pdf p. 63):
1% and 3% of the official estimated cost of the tender.IFT/TD; instead, it is stated as a rounded fixed lump-sum figure.Notebook.pdf p. 63):
1%–3% band while preventing any bidder from deducing the exact official estimate.~2% (rounded) of that lot's estimated value.NOA) to furnish the required Performance Security.NOA) to sign the Contract Agreement.Notebook.pdf p. 64 & Lec 20 p. 27–28)NOA) and prior to signing the Contract, guaranteeing faithful and complete performance of all contractual obligations.5% to 10% of the Contract Price (specifically 10% for Goods and standard Works; or 5% for large Works where 5% Retention Money is also deducted from interim bills).15%–25% (or higher as determined by the TEC) if the winning tender is judged to be unbalanced, front-loaded, or significantly low-priced (Rule 27(2)).NOA) of receiving the NOA.Notebook.pdf p. 64–65)5% to 10%) deducted progressively by the Procuring Entity from each Interim Payment Certificate (IPC / Running Bill) of a Works contractor and held as cash security against latent construction defects appearing during the Defects Liability Period (DLP).Performance Security + Retention Money):
PPR 2008 (Notebook.pdf p. 65), the combined total of Performance Security + Retention Money retained on a standard Works contract shall NOT exceed 10% of the total contract price (e.g., 5% upfront Performance Security + 5% deducted as Retention Money from running bills = 10% total).50% of Retention Money: Released to the Contractor upon issuance of the Taking-Over Certificate (Completion Certificate) upon physical completion of the works.50% of Retention Money: Released after the expiry of the Defects Liability Period (DLP) upon issuance of the Defects Liability Certificate (or earlier if replaced by an unconditional Bank Guarantee of equivalent value).Tender Security vs. Performance Security vs. Retention Money)| Feature | Tender Security | Performance Security | Retention Money |
|---|---|---|---|
| Submitted By | All Tenderers participating in the bid. | Only the Successful Tenderer (winner receiving NOA). |
Works Contractor (deducted from interim running bills). |
| When Submitted | With the Tender before the submission deadline. | Within 14 days after receiving the NOA (before signing Contract). |
Deducted progressively from each Interim Payment Certificate (IPC). |
| Amount / Rate | Fixed rounded lump sum equal to 1%–3% of the official estimate. |
5%–10% of the Contract Price (higher if front-loaded/abnormally low). |
5%–10% of each running bill (such that Performance Security + Retention ≤ 10%). |
| Core Purpose | Ensures bid seriousness and guarantees the winner will accept NOA & sign the contract. |
Guarantees faithful execution of the Contract. | Covers rectification of defects during the Defects Liability Period (DLP). |
| When Released | Returned to unsuccessful bidders after contract signing; to winner upon furnishing Performance Security. | Released 28 days after completion of all contractual/warranty obligations. | 50% at physical completion; 50% after expiry of the Defects Liability Period. |
Source File:
SA/Lec 19 GEEM 445 PPR Intellec Svc.pdf(26 pages)
2023 (Sec B, Q7b) · 2021 (Sec B, Q6c) · 2019 (Sec A, Q4a)SA/Lec 19 GEEM 445 PPR Intellec Svc.pdf (p. 2–9)p. 2–6)| Dimension | Goods and Works | Intellectual and Professional Services (Consultancy) |
|---|---|---|
| 1. Nature of Output | Tangible, physical, and quantifiable outputs (machinery, buildings, roads, bridges). | Intangible, intellectual, and advisory outputs (feasibility studies, designs, reports, supervision). |
| 2. Specification Clarity | Technical specifications and BOQ quantities can be precisely measured and specified upfront. |
Exact intellectual output quality cannot be rigidly quantified in advance; guided by Terms of Reference (TOR). |
| 3. Primary Selection Basis | Price-driven (awarded to the Lowest Evaluated Substantially Responsive Tenderer). | Quality- and competence-driven (technical methodology and key experts' qualifications carry 70%–90% weight). |
| 4. Solicitation Document | Tender Document (TD) issued via open Invitation for Tender (IFT). |
Request for Proposal (RFP) issued only to a Shortlist of 4–7 firms selected via REOI. |
| 5. Submission Format | Normally a single sealed envelope (except Two-Stage / Two-Envelope cases). | Mandatory Two-Envelope System (Technical Proposal and Financial Proposal sealed separately). |
| 6. Bid / Tender Security | Mandatory Tender Security (1%–3% fixed amount) and Performance Security (5%–10%). |
No Proposal Security or Performance Security is required for consultancy proposals under PPR 2008. |
| 7. Public Opening | Single public opening of tenders by the TOC. |
Two-stage opening: Technical Proposals opened first; Financial Proposals opened later only for firms scoring above the minimum technical threshold (typically ≥ 70%). |
| 8. Contract Negotiation | Price negotiation is strictly prohibited under OTM/LTM. |
Formal technical and financial negotiation with the first-ranked consultant is an integral step before award. |
p. 7–9)PE lacks highly specialized multidisciplinary skills needed for a complex project.EIA), safety audits, or dispute resolution.PE's own engineers.PPR 2008. Explain the key considerations and the seven steps of Quality and Cost Based Selection (QCBS).2025 (Sec B, Q7c) · 2024 (Sec B, Q6c) · 2023 (Sec B, Q7c) · 2021 (Sec B, Q6b) · 2019 (Sec A, Q4c)SA/Lec 19 GEEM 445 PPR Intellec Svc.pdf (p. 10–26)Rules 103–112, p. 10–14)QCBS): Compares both technical quality (70%–90% weight) and financial cost (10%–30% weight) among shortlisted firms.FBS): Used when the assignment is simple, precisely defined, and the budget is fixed (RFP states the maximum budget; the highest technical scorer within the budget wins).LCS): Used for standard, routine assignments (e.g., financial audits, simple surveys) where well-established practices exist; the firm with the lowest price among those scoring above the minimum qualifying technical mark (≥ 70%) is selected.SSS): Direct engagement of a single firm for natural continuation of previous work, emergency situations, very small assignments, or unique proprietary expertise.CSOS / NGO Selection): Used for social mobilization, resettlement, or community awareness tasks requiring grassroots NGO participation.SBCQ / CQS): Used for small assignments where preparing and evaluating full competitive proposals is not justified; RFP is requested only from the most qualified firm on the EOI list.DCS): Used for architectural, urban planning, or monument designs where aesthetic and symbolic excellence is selected by a jury.ICS): Used when a team of personnel is not required and the experience/qualification of an individual specialist is the paramount requirement.QCBS — Rule 105, p. 15–26)Step 1 — Preparation of TOR, Cost Estimate & Issuance of REOI:
PE prepares the Terms of Reference (TOR) and estimated person-month cost, and publishes a Request for Expression of Interest (REOI) in newspapers and on the CPTU website (≥ 14 days submission time).Step 2 — Assessment of EOIs & Short-Listing of Consultants:
PEC) evaluates the received EOIs (based on firm brochure, general & specific experience, management capacity, and key staff availability) and prepares a Shortlist of 4 to 7 qualified firms.Step 3 — Issuance of RFP & Receipt of Proposals (Two-Envelope System):
PE issues the Request for Proposal (RFP) to the shortlisted firms (≥ 28 days submission time). Firms submit a Technical Proposal and a Financial Proposal in two separate sealed envelopes.Step 4 — Opening & Evaluation of Technical Proposals by PEC:
PEC scores each Technical Proposal out of 100 points (assessing Firm Experience 5–10, Methodology & Work Plan 20–40, and Key Professional Staff Qualifications 50–70). Firms failing to achieve the Minimum Qualifying Technical Score (typically 70 or 75 points) are rejected, and their Financial Proposals are returned unopened.Step 5 — Public Opening of Financial Proposals & Combined Score Calculation:
Technically qualified firms are invited to the public opening of their Financial Proposals. The PEC checks arithmetic errors and calculates the Financial Score (): the lowest priced proposal () receives , and other proposals with price receive:
The Combined Total Score () is calculated using the weights specified in the RFP (where Technical Weight [range ] and Financial Weight [range ], with ):
Step 6 — Negotiation with the Highest-Ranked Consultant:
TOR refinement, work plan, staffing schedule, logistics, and reimbursable expenses (under QCBS, unit remuneration rates are generally not negotiated unless excessive).Step 7 — Approval and Signing of Contract:
PE issues the Notification of Award (NOA) and signs the Consultancy Contract.Source File:
SA/Lec 20 GEEM 445 Tend Docus.pdf(32 pages)
PPR 2008, and what information/conditions must the Procuring Entity set out in a Tender Document under Rule 4(3)? Also list the Standard Tender Documents (STDs) in Schedule-I and the nine sections of a Tender Document.2025 (Sec B, Q8c) · 2024 (Sec B, Q8a) · 2023 (Sec B, Q8a) · 2021 (Sec B, Q8a) · 2019 (Sec A, Q3b)SA/Lec 20 GEEM 445 Tend Docus.pdf (p. 2–17)Rule 4(2), p. 2–5)Under Rule 4(2) of PPR 2008, "Tender or Proposal Documents" include:
IFPQ) and Pre-Qualification Documents (if applicable)IFT) or Request for Expression of Interest (REOI)ITT) or Instructions to Consultants (ITC)TDS) or Proposal Data Sheet (PDS)GCC)PCC)BOQ) (for Works) or Terms of Reference (TOR) (for Services)PE prior to the submission deadline.PE in Tender Documents (Rule 4(3), p. 6–8)Under Rule 4(3), the Procuring Entity must clearly set out twelve key items in the Tender Document:
TEC.LD) for delay and warranty/Defects Liability Period (DLP).Rules 56–60).STDs) in Schedule-I of PPR 2008 (p. 11–13)PG Series):
PG1: Standard Request for Quotation (RFQ) Document for low-value Goods.PG2: Standard Tender Document for Procurement of Goods under LTM (or small National OTM).PG3: Standard Tender Document for Procurement of Goods under National OTM.PG4: Standard Tender Document for Procurement of Goods under International OTM.PW Series):
PW1: Standard Request for Quotation (RFQ) Document for small Works.PW2 (PW2a / PW2b): Standard Tender Document for Works under LTM / small-to-medium National OTM.PW3: Standard Tender Document for large Works under National OTM (above Tk 3 Crore).PS Series):
PS1 – PS4: Standard Request for Proposal (RFP) Documents for Consultancy Services.p. 14–17)ITT)TDS)GCC)PCC)BOQ) (or Schedule of Requirements for Goods)PPR 2008. Also explain the four stages of Tender Evaluation (ITT 49–59), Notification of Award (NOA), Performance Security, and Contract Signing timeline.2025 (Sec B, Q8c) · 2024 (Sec B, Q8a) · 2023 (Sec B, Q8a) · 2021 (Sec B, Q8a)SA/Lec 20 GEEM 445 Tend Docus.pdf (p. 9–10, 18–32)Rule 4(7), p. 9–10)If any ambiguity or discrepancy arises among contract documents during execution, they prevail in the following strict descending order of precedence under Rule 4(7) of PPR 2008:
NOA)PCC)GCC)BOQ) or Schedule of Requirements / Price SchedulesPCC as forming part of the Contract (e.g., Addenda, Minutes of Pre-Tender Meeting, Construction Schedule)Key Exam Takeaway: Specific/customized documents always override general boilerplate documents (e.g.,
PCCoverridesGCC;SpecificationsoverrideDrawings; andDrawingsoverride theBOQ).
ITT 49–59 (p. 18–26)ITT 49–51): Checking whether the Tender is properly signed, accompanied by a valid Tender Security of the required amount and validity, and meets basic legal eligibility (Trade License, TIN, VAT, non-debarment).ITT 52–53): Assessing whether the Tender substantially conforms to the Technical Specifications, Drawings, Delivery/Completion Schedule, and Contract Conditions without any Material Deviation, Reservation, or Omission.ITT 54–56): Correcting arithmetic errors (unit rate governs over line total; words govern over figures), applying any unconditional discounts offered before the deadline, checking for unbalanced/front-loaded rates, and ranking responsive tenders from lowest to highest evaluated price.ITT 57–59): Verifying that the Lowest Evaluated Responsive Tenderer genuinely satisfies all minimum qualification criteria stated in the TDS (specific construction experience, minimum average annual construction turnover AACT, liquid assets/credit line, key personnel, and major construction equipment).NOA), Performance Security & Contract Signing Timeline (ITT 65–70, p. 27–32)NOA — Rule 102): Prior to the expiration of the Tender Validity Period and within 7 working days of receiving approval from the Approving Authority, the PE issues the written Notification of Award (NOA) to the successful Tenderer.NOA, the successful Tenderer must furnish the Performance Security (5%–10% of the Contract Price, or higher if unbalanced/low-priced).NOA (and immediately after verifying the authenticity of the Performance Security with the issuing bank), both the Procuring Entity and the successful Tenderer must formally sign the Contract Agreement.PE's notice board and the CPTU website (e-GP) for public transparency.Source File:
SA/Lec 21 GEEM 445 PPR Spec.pdf(23 pages)
PPR 2008? Discuss the general principles for preparing specifications, including the rule on brand names and trademarks.2024 (Sec B, Q8b) · 2023 (Sec B, Q8b) · 2021 (Sec B, Q8b) · 2019 (Sec A, Q3c)SA/Lec 21 GEEM 445 PPR Spec.pdf (p. 2–23)p. 2–5)A Technical Specification is a detailed written description of the physical, functional, chemical, dimensional, and performance characteristics of Goods, Works, or Services to be procured. In engineering Works contracts, a complete specification comprises three core elements:
Rule 29(1), p. 6–10)Under Rule 29(1) of PPR 2008, the Procuring Entity must ensure that technical specifications provide a complete, accurate, and neutral description covering:
PSI), or engineer's approval certificates.SI) units.PE staff, and post-commissioning warranty support.Rule 29(2)–(5), p. 11–23)BOQ: Every item in the BOQ and Drawings must have a matching, non-contradictory specification clause.BSTI — Bangladesh Standards and Testing Institution, BNBC, PWD/LGED/RHD standards) or international standards (ISO, IEC, ASTM, BS), always followed by the phrase "or equivalent".Rule 29(3)):
Source File:
SA/Lec 22 GEEM 445 PPR Tender Eval.pdf(17 pages)
TEC shall NOT continue to evaluate a tender. Also explain what actions the TEC must take when: (i) the lowest evaluated price is significantly low (or front-loaded), (ii) the lowest evaluated price is significantly higher than the official estimate, and (iii) there is a tie for the lowest evaluated price.2024 (Sec B, Q8c) · 2023 (Sec B, Q8c) · 2021 (Sec B, Q8c)SA/Lec 22 GEEM 445 PPR Tender Eval.pdf (p. 2–17)Rule 98, p. 4–6)Under Rule 98 of PPR 2008, a Material Deviation, Reservation, or Omission is one that:
Any tender containing a Material Deviation is declared Non-Responsive and must be rejected; it cannot subsequently be made responsive by the Tenderer correcting or withdrawing the deviation after opening.
TEC Shall NOT Continue to Evaluate a Tender (p. 7–8)The Tender Evaluation Committee (TEC) shall immediately halt further evaluation of a tender and reject it if:
TEC according to the arithmetic correction rules (which also triggers forfeiture of their Tender Security).TEC in Special Price Scenarios (p. 9–17)Rule 98(21)–(24), p. 9–12)ALT): Occurs when the overall quoted price is significantly below the Official Cost Estimate and market rates, raising severe risk of contract abandonment or substandard quality.TEC:
TEC formally requests the Tenderer to submit a detailed written Rate Analysis (breakdown of materials, labour, equipment, and overhead) and supporting price quotes to justify the sustainability of the low or unbalanced unit rates.TEC may recommend rejecting the tender with the approval of HOPE.TEC accepts the tender subject to the Tenderer furnishing an increased Performance Security—raising the Performance Security from the standard 5%–10% up to 15%–25% (or an additional bank guarantee covering the difference) at the Tenderer's own expense to protect the PE against default.Rule 98(25)–(27), p. 13–15)TEC:
TEC examines whether the Procuring Entity's Official Cost Estimate was realistic or had become outdated due to recent market price inflation.TEC may recommend award provided additional budget allocation is available and approved by the competent Approving Authority.PE may (if permitted by the TD) reduce the physical scope/quantities within the 15% variation limit across the board, ORHOPE and invite Re-Tenders after revising specifications or updating the official estimate. (Note: Direct price negotiation to lower the bid price under OTM is strictly prohibited).Rule 98(29), p. 16–17)TEC selects the Tenderer offering superior technical performance, earlier delivery schedule, or higher domestic value addition as specified in the TD; if still tied, selection is resolved by a transparent Public Lottery in the presence of the tied Tenderers.TEC compares the tied Tenderers' specific construction experience, Average Annual Construction Turnover (AACT), and liquid asset capacity, or conducts a transparent Public Lottery in the presence of the tied bidders as stipulated in the Rules.Source File:
SA/Lec 23 GEEM 445 Job Aplication.pdf(24 pages)
2024 (Sec A, Q4d) · 2021 (Sec A, Q1d)SA/Lec 23 GEEM 445 Job Aplication.pdf (p. 2–10)p. 2–5)Before writing a CV or cover letter, an applicant must perform two core tasks backed by three areas of research:
AutoCAD, ETABS, GIS, HEC-RAS), internships, leadership roles, and career goals.IEB), and growth opportunities in that sector.p. 6–8)p. 9–10)ASCE/IEB), or extracurricular initiatives.CV)". State the seven main parts of a standard CV, list the common reasons why CVs get rejected, and prepare a sample professional CV and Cover Letter for a fresh graduate Civil/Environmental/Water Resources Engineer.2024 (Sec A, Q4d) · 2022 (Sec A, Q2a, Q2b) · 2021 (Sec A, Q1d) · 2019 (Sec B, Q6a)SA/Lec 23 GEEM 445 Job Aplication.pdf (p. 11–24)CV)A Curriculum Vitae (CV) (Latin for "course of life") is a structured, concise marketing document (1–2 pages for fresh graduates) that summarizes an individual's contact details, career objective, educational qualifications, technical skills, project/research experience, achievements, and references to secure a job interview.
p. 16–20)2–3 line statement tailored to the target engineering role and the value the candidate brings.AutoCAD, ETABS, STAAD.Pro, ArcGIS, HEC-RAS, EPANET, MS Project), laboratory testing skills, and language proficiency.p. 14–15)4–5 pages of filler).p. 21–24)24 October 2026
The Head of Human Resources
Infrastructure Development & Engineering Consultants Ltd. (IDECL)
Gulshan-2, Dhaka-1212, Bangladesh
Subject: Application for the Post of "Assistant Engineer (Water Resources & Environmental)"
Dear Sir/Madam,
In response to your vacancy announcement published on 15 October 2026, I am writing to apply
for the position of Assistant Engineer (Water Resources & Environmental) at IDECL. I have
recently completed my B.Sc. in Environmental, Water Resources and Coastal Engineering (EWCE)
from the Military Institute of Science and Technology (MIST) with a CGPA of 3.78 out of 4.00.
During my undergraduate studies, I developed a strong foundation in hydraulic modeling, urban
drainage design, water treatment processes, and public procurement practices (PPR 2008). For
my undergraduate thesis, I modeled urban flood inundation and stormwater drainage optimization
using HEC-RAS and EPA SWMM. Additionally, during my four-week industrial attachment at the
Bangladesh Water Development Board (BWDB), I gained hands-on exposure to riverbank protection
design, Bill of Quantities (BOQ) preparation, and site quality control.
I am proficient in AutoCAD, ArcGIS, HEC-RAS, EPANET, and MS Project, and I thrive in
collaborative, deadline-driven engineering environments. My Curriculum Vitae and academic
transcripts are enclosed for your kind review. I would welcome the opportunity to discuss how
my technical skills and enthusiasm can contribute to IDECL's ongoing infrastructure projects.
Thank you for your time and consideration.
Yours sincerely,
(Signed)
Engr. Rafiqul Hasan
Mirpur DOHS, Dhaka-1216
Mobile: +880-17XX-XXXXXX | Email: [email protected]
Enclosure: Curriculum Vitae (2 pages) & Academic Certificates
CV)================================================================================
ENGR. RAFIQUL HASAN
B.Sc. in Environmental, Water Resources & Coastal Engineering (EWCE)
================================================================================
Address : House 14, Road 6, Mirpur DOHS, Dhaka-1216, Bangladesh
Mobile : +880-17XX-XXXXXX
Email : [email protected]
LinkedIn: linkedin.com/in/rafiqul-hasan-ewce
--------------------------------------------------------------------------------
1. CAREER OBJECTIVE
To build a challenging career as a Civil, Water Resources, and Environmental
Engineer where I can apply my analytical skills in hydraulic modeling, sustainable
infrastructure design, and project management while upholding engineering ethics.
2. EDUCATIONAL QUALIFICATIONS
- B.Sc. in Environmental, Water Resources & Coastal Engineering (EWCE) [2022–2026]
Military Institute of Science and Technology (MIST), Dhaka
CGPA: 3.78 / 4.00 (First Class with Honours)
- Higher Secondary Certificate (HSC — Science Group) [2021]
Notre Dame College, Dhaka | GPA: 5.00 / 5.00
- Secondary School Certificate (SSC — Science Group) [2019]
Ideal School and College, Motijheel, Dhaka | GPA: 5.00 / 5.00
3. UNDERGRADUATE THESIS & CAPSTONE DESIGN PROJECTS
- Undergraduate Thesis: "2D Hydrodynamic Modeling and Climate-Resilient Urban
Drainage Design for Eastern Dhaka Using HEC-RAS and EPA SWMM."
- Capstone Design Project: Complete structural, hydraulic, and environmental
design (including BOQ, Technical Specifications, and DPP summary) of a 50 MLD
Surface Water Treatment Plant and Distribution Network.
4. INDUSTRIAL TRAINING / INTERNSHIP EXPERIENCE
- Trainee Engineer (Intern), Bangladesh Water Development Board (BWDB) [June 2025]
* Assisted project engineers in bank protection design along the Padma River.
* Participated in field bathymetric surveys, geotextile quality testing, and
preparation of Admeasurement Bill of Quantities (BOQ) under PPR 2008.
5. TECHNICAL & SOFTWARE SKILLS
- Modeling & Design : HEC-RAS, HEC-HMS, EPA SWMM, EPANET, AutoCAD 2D/3D, ETABS
- GIS & Data Tools : ArcGIS Pro, QGIS, MATLAB, Python, MS Excel (Advanced)
- Project Management: MS Project, Primavera P6, Public Procurement Rules (PPR 2008)
- Languages : Bengali (Native), English (Fluent in technical writing & speaking)
6. ACHIEVEMENTS & LEADERSHIP ACTIVITIES
- Dean's List Award (MIST) for academic excellence in Level-3 and Level-4.
- Vice-President, MIST Environmental & Water Resources Engineering Club (2025–2026).
7. REFERENCES
(1) Prof. Dr. [Name] (2) Brig Gen / Prof. [Name]
Professor & Thesis Supervisor, Dept. of EWCE Head, Department of EWCE
MIST, Mirpur Cantonment, Dhaka-1216 MIST, Mirpur Cantonment, Dhaka-1216
Email: [email protected] Email: [email protected]
================================================================================
Source File:
SA/Lec 24 GEEM 445 DPP.pdf(19 pages)
DPP)? Describe the structure of the DPP Manual (Part A, Part B, Log-Frame, Risk Analysis), the two types of public sector projects, and the six-step DPP approval process in Bangladesh (including the financial approval limits of the Planning Minister and ECNEC).2025 (Sec B, Q5c) · 2023 (Sec A, Q4b) · 2022 (Sec B, Q5c) · 2019 (Sec A, Q2c)SA/Lec 24 GEEM 445 DPP.pdf (p. 2–19)DPP (p. 2–4)A Development Project Proposal / Proforma (DPP) is the mandatory, standardized government appraisal and approval document formulated by an Executing Agency (under the guidelines of the Planning Commission, Ministry of Planning, Government of Bangladesh) to secure approval and Annual Development Programme (ADP) funding for any public-sector capital investment project.
p. 5–6)DPP): Capital development projects that create physical infrastructure, capital assets, or socio-economic facilities (e.g., bridges, highways, water treatment plants, embankments, power plants).TA) Projects (Formulated using TPP — Technical Assistance Project Proforma): Projects focused on pre-investment feasibility studies, master planning, institutional capacity building, training, and consultancy support rather than physical construction.DPP Document (p. 7–12)According to the Planning Commission's DPP Manual, a standard DPP consists of two main parts supported by key analytical annexes:
Items 1–15):
Items 16–30+):
BCR, NPV, IRR), Environmental & Social Impact Assessment (EIA), Operation & Maintenance (O&M) plan post-completion, and Total Procurement Plan (Goods, Works, and Services packages under PPR 2008).Log-Frame) Matrix (p. 10):
4 × 4 summary matrix linking Goal Purpose/Outcome Outputs Inputs/Activities across four columns:
OVI)MOV)p. 11–12):
DPP Formulation and Approval Process in Bangladesh (p. 13–19)[Step 1: Concept & Feasibility Study by Executing Agency (e.g., BWDB/LGED/RHD/DPHE)]
│
▼
[Step 2: Preparation of Draft DPP & Scrutiny by Sponsoring Ministry (MSC Meeting)]
│
▼
[Step 3: Submission of DPP to Sector Division of the Planning Commission]
│
▼
[Step 4: Appraisal & Inter-Ministerial Evaluation by PEC (Project Evaluation Committee)]
│
┌──────────────┴──────────────┐
▼ ▼
[Estimated Cost ≤ Tk 50 Crore] [Estimated Cost > Tk 50 Crore]
│ │
▼ ▼
[Step 5A: Approved by the] [Step 5B: Approved by ECNEC]
[Planning Minister] [(Chaired by Prime Minister /
│ Chief Adviser of Government)]
└──────────────┬──────────────┘
▼
[Step 6: Issuance of Administrative Approval Order by Sponsoring Ministry & Inclusion in ADP]
BWDB, RHD, LGED, DPHE, WASA) identifies the project need, conducts a mandatory Feasibility Study, and prepares the initial draft DPP (ensuring the project is listed in the Green Pages of the ADP for unapproved projects awaiting allocation).MSC) Review (Sponsoring Ministry): The draft DPP is submitted to the administrative/sponsoring Ministry, where the Secretary chairs the Departmental/Ministerial Scrutiny Committee (MSC) to verify policy alignment and budget ceiling before forwarding it to the Planning Commission.BCR, NPV, IRR), and procurement conformity (PPR 2008 via IMED).PEC): The Member of the relevant Sector Division of the Planning Commission chairs an inter-ministerial Project Evaluation Committee (PEC) meeting (attended by the Ministry of Finance, ERD, IMED, Department of Environment, and the Executing Agency). The PEC recommends modifications, cost rationalizations, and endorses the DPP for final sanction.Planning Minister vs. ECNEC):
≤ Tk 50 Crore): Approved directly by the Minister for Planning.> Tk 50 Crore): Placed before and approved by ECNEC (Executive Committee of the National Economic Council), chaired by the Head of Government (Prime Minister / Chief Adviser).ADP Resource Allocation: Following Planning Minister or ECNEC sanction, the sponsoring Ministry issues the formal Administrative Approval Order, a Project Director (PD) is appointed, and annual funds are released through the Annual Development Programme (ADP) to commence implementation (Zero-Date).Note: The following questions appeared in the 2019 and 2022 question papers (
EWC 401earlier syllabus or general engineering communication/management questions) and do not have direct slide pages in the current/GEEM 445/SA/folder. Complete, exam-ready model answers are provided below so that 100% of past exam questions across all six years are fully answered.
2022 (Sec A, Q2c) · 2019 (Sec B, Q5a, Q5b, Q5c)/SA/ lecture slides — General Engineering Communication syllabus)| Feature | Technical Writing | General / Creative Writing |
|---|---|---|
| Primary Purpose | To inform, instruct, document, or persuade a specific audience to make decisions or perform technical actions. | To entertain, evoke emotion, express artistic imagination, or share personal reflections. |
| Content & Tone | Objective, factual, precise, impersonal, and verifiable data. | Subjective, imaginative, figurative, emotional, and narrative. |
| Language & Vocabulary | Clear, concise, unambiguous, and uses standardized technical terminology (7 Cs). | Rich, metaphorical, poetic, and open to multiple interpretations. |
| Structure & Visuals | Highly structured with numbered headings, bullet lists, tables, equations, and engineering drawings. | Continuous prose, chapters, or verse; rarely uses technical tables or schematics. |
Q&A) session?2019 (Sec B, Q8a, Q8b, Q8c)/SA/ lecture slides — General Engineering Communication syllabus)10%–15%): Hook the audience, state the problem/objective, and preview the presentation outline ("Tell them what you are going to tell them").70%–80%): Present 3–5 core technical points logically with clear transitions and visual evidence ("Tell them").10%): Summarize key takeaways and state a clear recommendation or call to action ("Tell them what you told them").6 × 6 Rule):
6 bullet points per slide and 6–8 words per line); prefer high-contrast diagrams, graphs, and flowcharts over walls of text.≥ 24 pt for body text, ≥ 32–36 pt for titles).Q&A Session Professionally